Gold mining dredger
USD $300,000 - $1,000,000 /Set
Min.Order:1 Set
Weifang Hailing dredger co.Ltd
1. Located in Weifang City,Shandong
2. 9 workshops
3. One office building for sales department
4. Established in 2011,expansion for mass production compare to Haiyang
5. Dredger producting ,assemble,testing and dismantle for shiping center.
6. 15000 square meter for workers recreation
7. Testing center for 8mdepth
8. Near to Weifang Port
1. The introduction of our products:
It is a kind of gold mining equipment, dismantles type with hydraulic operation system, can be put into container and assemble at working site. The main hulls are made up of three pontoons, which can be assembled to complete when working. The controlling room is also dismountable, which can be dismantling when passing through bridges. Especially when it is in unconnected water areas, the hull can be dismounted and transported by cars or trains. The driving devices are also use lubes oil and sealed-in units.
We can also design and produce special types of machinery according to customers’ requirements.
2. Product images for your references
products images:
The specification list for your reference:
| Name |
| HLC1000 hydraulic cutter suction dredger |
| Type |
| Bucket dredger |
| Dimensions | ||
| Single Pontoon size |
| Length* width* depth 40*6.6*1.2m |
| Structure |
| Can be dismantle and assemble at working site |
| Max. dredging depth |
| 15m |
| Discharge distance |
| 200m |
| Working capacity |
| 200m3/h |
| Main engine power |
| 75kw |
| Auxiliary engine power |
| 15kw |
| Max. oil consumption |
| 40kg/h |
Other products:
workshop images:
Weifang Hailingdredger Co.,Ltd
1. Blanking workshop
2. Gold panning machinery processing workshop
3. Machining workshop
4. Anti-corrosion workshop
5. General assembly workshop
6. Testing center before ex-factory
7. Painting workshop
8. Dismantle workshop
Spares:
The dredge pump is driven by the main diesel engine through the gear down box.
The alternator driven by the auxiliary diesel engine supplies the electricity for the whole ship power and lighting.
The genet supplies the electricity for lighting and emergency use when the ship stops.
The cutter (bucket wheel) is dirven by hydraulic motor, the cutter(bucket wheel) bear has lubrication seal device.
The dredger is moved by the alternate swing of the spuds. The spuds is lifted by the hydraulic cylinder.
The shifting winch,cutter(bucket wheel) ladder lifting winches fixed on the ship are driven by the hydraulic motor.
The hydraulic pump is driven by the auxiliary diesel engine.
The design,building and inspection are in according to the standard requirements of CCS.
Our company and testing pools:
Transportation:
Shipping to the Tianjin Port.
Our dredger will be dismantle for different parts and then shipping to the port. The dismantle structrue is convenient for transport in the working process if in different working sites.
Customers' visiting:
Note
All necessory tools, tackles, plants and machineries required for the installation, testing and commissioning of silt dredging equipment shall be in the scope of the buyer.
It is the responsibility of the buyer to store of the material at appropriate locations at their own cost if required. However, storage site shall be provided by the buyer.
Installation
Responsibility for the seller
The seller shall provide technical personnel who are skilled and experienced in their respective callings and help installation for the work at hand.
Engineers for helping installation and debugging
The seller shall provide two engineers on the site in the execution of the training works for skilled, semi-skilled and unskilled workers of the buyer
The buyer shall be responsible for the recruitment, transportation, accommodation, and medical care and catering of all labor, local or expatriate, and for all payments in connection therewith.