Mud/Sand alluvial/gold mining or gold dredging equipment with wheel on dry land
USD $30,000 - $3,000,000 /Set
Min.Order:1 Set
Gold process equipment Small scale placer gold mining equipment and gold dredge machinery
1250 m3 Jet Suction Gold Dredging Dredger for Gold Mining in Mongolia
12 inch China Cutter Suction Dredger Machine/Vessel in stock for sale
18 inch Cutter Suction Dredger For Sale/ New cutter machinery cutter head suction dredger
1. Different model of dredging equipment sold to different countries in the world |
1.1 For sales-service: a. experienced and skilled engineers will be in the working place for dredging equipment installation and testing for working normally; b. Will training and teaching workers for operation and gold collection; c. Daily operation maintaining; d. Water supply when the equipment is working; e. Working time for the equipment can be day and night. |
2. Company profile and customer from different countries all over the world |
Company profile for gold mining and dredging machinery: a. Expert for equipment design according to working place; b. Crude mineral testing in factory lab; c. Long-time cooperation with famouse gold institute; d. Dredging equipment working video for Customers from different countries; e. Dredging equipment can be tested in factory before shipment; f. Spares are available at any time; g. Free serivce all the life; h. After-sale service is available 7x24 hours; i. Factory audit is surporting; j. Contact us for cooperation in the long run. |
2.1 Different customers and trading companies from different countries in the world-Long cooperation for gold mining equipment |
3. Technical specifications for gold mining equipment and Pictures for customer references |
JMG200 Alluvial sluice gold machine | with vibrating screen. |
Using for gold mining from river sand | |
Capacity | 200 cbm/h |
Length | 8m |
Width | 3.5m |
Height | 5m |
Power | 55.5KW |
Chute No. | 3-4 pcs |
Weight | 22T |
Package | 1x40HQ |
Delivery | 7 to 10 days |
3.1 Working principle for the gold dredging equipment, special one can be custom building |
4. Gold mining /dredging equipment production in the workshop/Jin Meng Dredger |
5. NEW Gold mining equipment in stock, deliver time 10-30 days after order confirmed Contrifugal machine is available of 5 days after order confirmed |
5. Gold mining equipment, for answer and question |
Before we produce the gold dredger, we need know following conditions in your river:
a. F: Working area of gold dredger inland river or Coastal area or Dry land with water source A: Gold mining equipment will be designed according to different working places.
b. F: The water depth from water surface to sand if working in water? A: Dredging equipment is available for gold mining from lake, river, sea as: 1. Bucket chain dredger( Stone percentage is more than 30%); 2. Cutter suction dredger(Stone percentage is less than 20%); 3. Jet suction dredger(Stone percentage is less than 10% for fine sand)
c. F: Sand or mud thickness in river or in hill A: Sand thickness+water thickness=Dredging depth in water Mud thickness+stone thickness=Gold dredging thickness
d. Degree of the sand or mud soft or hard, may be better for pictures and crude ore. e. F: Clay content? A: Screener is available for clay washing and cleaning the sand
f. Stone diameter is required between 1cm to 3cm, and it is better to offer the percentage. g. Stone percentage of diameter 30cm h. Coarse particle gold or fine particle gold i. Working capacity per hour j. Use network electricity or generator
|
6. Pontoon testing for gold mining/dredging equipment before shipment |
7. Pictures for Crude ore and gold dredging from the customers |
Welcome to visit our factory and workshop/Jin Meng Gold dredging equipment and machiner |