Wholesale Tension Intelligent Tensioning Machine
USD $21000 - $28000 /Set
Min.Order:1 Set
Shaanxi Zhongtuo Mine Equipment Co.,Ltd
Automation, high efficiency, accurate and accurate data, simple operation, safety, double use, Jack special distribution
First, characteristics of Intelligent Prestressed Tension:
The prestressed intelligent tensioning system adopts liquid crystal touch screen and PLC programming control system. The structure is simple and the performance is stable and reliable. A digital pressure meter is installed on the high pressure oil pump, and a displacement sensor is mounted on the jack. During the tensioning process, the oil pump pressure and the jack elongation are transmitted to the computer through the sensor to the PLC control box, and the computer is controlled to synchronize the two ends at the same time, and the data can be printed in real time.
Parameters of Tension Intelligent Tensioning Machine:
Tension system technical indicators
Force system accuracy 0.3% F.S
Displacement measurement accuracy 0.5%
Double top pair pull unbalance 5KN
Hydraulic station working voltage 380 ± 10%
Control system Operating voltage 220 ± 10%
Use temperature -20 ℃ -50 ℃ |
Hydraulic station
Maximum oil pressure 60MPa
Flow 3L / min
Motor power 3KW
Use voltage 380V |
Features of Intelligent Automatic Tension Equipment:
1. Control module (1 control 2)
2. On-site monitoring computer (Lenovo Zhaoyang E46A370 notebook computer)
3. Data transmission module (main pump and auxiliary pump 200M range, the main pump and on-site monitoring computer 2KM or less)
4.7 inch touch screen (main pump) text display (vice pump)
5. Displacement sensor (precision 0.1mm) Pressure sensor (accuracy 0.1MPa0
6.High-pressure hydraulic control valve (63MPa)
7. The main pump storage U disk (4G)
Application of intelligent tensioning equipment:
1). For Buildings: Housing, Commercial Buildings, High Rise Buildings.
2). For Municipal Engineering: Railway, Highway, Over Head Fast Speed Way, Metro Way, High-speed Railway, etc.
3). For Projects: Mining, Piling, Foundation, Slope and Rock Reinforcement, Hydropower Station, Anchoring Engineers, Water Conservancy Project, Oil or Gas Tank, etc.