Product Details

Galvanised Steel C Profiled Purline Roll Former Machine With Cr12 Mould Steel Rollers

Brand Name Creation
Place of Origin China
Model Number CYX-300

Product Features

Delivery Time:70 working days after received your payment
Certification:ISO 9001:2008, CE, SONCAP

Galvanised Steel C Profiled Purline Cold Rollformer Machine With Cr12 Mould Steel Rollers and Hydraulic Cutter

Introduction

This purlin cold roll forming machine adopts Cr12 mould steel for the rollers and cutting blades to make galvanized steel C profiled purlines with a perfect quality. The suitable steel sheet thickness can be 1.0-2.0mm or 2.0mm-3.0mm, which decides the rollers design and machine cost.

Cee Purline Sizes

Technical Specifications of Steel C Section Purlin Roll Forming Line

Uncoiler (manual/automatic)

Holding Capacity

3 tons

Inner Diameter

508mm

Outside Diameter

1200mm

Coil width

Max. 600mm

Feeding and

straightening device

Pinch rollers

two sets

Straightening rollers

three up, four down

Diameter of rollers

75mm

Metal Roll Former

Frame type

steel wall plates

Forming Roller stand

about 14 Groups

Shaft material

First grade 45# steel,

Shaft diameter

75mm

Roller material

Cr12 with quenching treatment

Motor driving Type

chains transmission

Main Motor

15KW 

Size changing method

regulation of spacers manually

Punching Device

Type

Hydraulic

Material

Cr12 mould steel

Holes distance

Adjustable

Hydraulic cutter

Type

Post-cutting

Material of mould

Cr12 mould steel

Cutting tolerance

± 2mm

PLC control cabinet

PLC

Mitsubishi from Japan

Length Meaturing

Omron Encoder

Touching Screen

Mitsubishi from Japan

Transducer

Mitsubishi

Hydraulic station

Power

7.5 KW

Hydraulic pressure

11 Mpa

Runout Table

Non-power type or auto stacker

 Optional

Working Flow of Steel C Section Purlin Roll Forming Line

Decoiling----Guilding----Leveling----Rollforming----Punching Holes----Cutting----C purlins on tables

Installation and training

1. The buyer can send workers or technicians to our factory to accept training for free.

2. We can send detailed operation manual and video to the buyer to do the installation and commission

3. If the buyer need our technicians to assist on the installation and commission in his workshop, we can send one or two of our technicans to do that and the buyer is required to afford the round flight tickets, supply hotel, food and pay USD100/day to our technicians.
 

After Service

1. One year's guarantee

2. Feedback for technical support within 24 hours

3. Spare parts all the time and delivered to customers within 7 working days

You May Like

Find Similar Products By Category

You May Like

View More
Chat Now Contact Now