Guigang Tongji Bridge Civil Engineering Bridge Construction for concrete beam movement and positioni

Guigang Tongji Bridge Civil Engineering Bridge Construction for concrete beam movement and positioni

Negotiable /Set

Min.Order:1 Set

Supply Ability:
0 Set / Sets per Month
Payment Terms:
T/T L/C D/P D/A
Delivery Detail:
7 days

Quick Details View All >

Brand Name:
Kattor
Place of Origin:
China
Model Number:
3DAS Series,

China Engineering Equipment Network Co.,Ltd

Business Type: Trading Company
Main Products:

Product Details

Delivery Time:4~8weeks
Certification:ISO9001

 Guigang Tongji Bridge Civil Engineering Bridge Construction for concrete beam movement and positioning

Project Name: 3D Adjustment System applied in Guigang Tongji Bridge


Location: Guigang city, Guangxi Province

Project profile:


With Tongji Avenue at the north side, Guigang Tongji Bridge stretches from East Jiangbei Road and spans Yujiang River, connecting Jiangnan Avenue at South. Total length of Guigang Tongji Bridge is around 2943.9m, and main bridge is about 1807.5m long and 38m wide. The main bridge adopts steel box girders and self-anchored suspension structure with six lanes in two-way direction (eight lanes are available as per future demand). Approach bridge is constructed by pre-stressed concrete continuous beams.

Challenge:
 
During construction process, in order to make the concrete beam section II and III fall on the supporting bearings, the head part of beam section II should be lowered 910mm, and the end part of beam section III should be lifted 340mm, with horizontal corrective displacement of 150mm.


Solution:
According to jobsite working condition and the technical requirements of three dimension positioning, KATTOR designed long-stroke three-dimension-adjustment system (3DAS). Two sets of 600t cylinders were horizontally arranged on top of temporary pier. On pier S2, there were four sets of 600t cylinders installed on horizontal and longitudinal directions. On pier S3, two sets of 600t cylinders were horizontally arranged. The entire 3DAS system adopted PLC integrated controlling system to realize the precise movement on longitudinal, horizontal and vertical directions, therefore to complete the precise adjustment and positioning of the whole concrete beam section.

Applied product: 
KATTOR 3D Adjustment System (3DAS)

Contact Supplier

Mr. Henry Z sale Manager Chat Now
Telephone
86-27-87779836
Mobile
86-13659870758
Fax
86-27-87745210
Skype
henry-aoc
Address
3F, Block B, Wenchang Building, International Enterprise Center, Donghu High Tech Zone, Wuhan City, Heze,Shandong

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Machinery > Plastic & Rubber Machinery > Plastic Product Making Machinery > Plastic Vacuum Forming Machines
Categories
Hi~