Guigang Tongji Bridge Civil Engineering Bridge Construction for concrete beam movement and positioni
Negotiable /Set
Min.Order:1 Set
Longhu inner ring road Bridge Civil Engineering Bridge Construction incremental launching system
Intelligent 3D Adjustment System Civil Engineering Bridge Construction for Luzhou Tuo river No.4 Bri
Intelligent Civil Engineering Bridge Construction Strand-jack System for Wuhan Qingshan Yangtze Riv
Civil Engineering Bridge Construction , DZJ-120 Pile Driving Hammer and DZJ-480 for Jiashao Sea-cros
DZJ-600 Tandem Pile Hammer with Huanggang Yangtze River Highway-railway Cable-stayed Bridge
Guigang Tongji Bridge Civil Engineering Bridge Construction for concrete beam movement and positioning
Project Name: 3D Adjustment System applied in Guigang Tongji Bridge
Location: Guigang city, Guangxi Province
Project profile:
With Tongji Avenue at the north side, Guigang Tongji Bridge stretches from East Jiangbei Road and spans Yujiang River, connecting Jiangnan Avenue at South. Total length of Guigang Tongji Bridge is around 2943.9m, and main bridge is about 1807.5m long and 38m wide. The main bridge adopts steel box girders and self-anchored suspension structure with six lanes in two-way direction (eight lanes are available as per future demand). Approach bridge is constructed by pre-stressed concrete continuous beams.
Challenge:
During construction process, in order to make the concrete beam section II and III fall on the supporting bearings, the head part of beam section II should be lowered 910mm, and the end part of beam section III should be lifted 340mm, with horizontal corrective displacement of 150mm.
Solution:
According to jobsite working condition and the technical requirements of three dimension positioning, KATTOR designed long-stroke three-dimension-adjustment system (3DAS). Two sets of 600t cylinders were horizontally arranged on top of temporary pier. On pier S2, there were four sets of 600t cylinders installed on horizontal and longitudinal directions. On pier S3, two sets of 600t cylinders were horizontally arranged. The entire 3DAS system adopted PLC integrated controlling system to realize the precise movement on longitudinal, horizontal and vertical directions, therefore to complete the precise adjustment and positioning of the whole concrete beam section.
Applied product:
KATTOR 3D Adjustment System (3DAS)