Intelligent Civil Engineering Bridge Construction Strand-jack System for Wuhan Qingshan Yangtze Riv
Negotiable /Piece
Min.Order:1 Piece
Civil Engineering Bridge Construction , DZJ-120 Pile Driving Hammer and DZJ-480 for Jiashao Sea-cros
DZJ-600 Tandem Pile Hammer with Huanggang Yangtze River Highway-railway Cable-stayed Bridge
DZJ-300 pilling machine - BIG SIZE , pile hammer Shock-proof motor
Hollow Plunger High Strength Alloy Steel Hydraulic Cylinder RRH Series 30ton / 60ton / 95ton
150 Ton / 200 Ton Double Acting Hydraulic Cylinder Aluminum RAR-Series
Intelligent Civil Engineering Bridge Construction Strand-jack System for Wuhan Qingshan Yangtze River Bridg
Project Name: Intelligent Continuous Strand-jack System applied in Wuhan Qingshan Yangtze River Bridge
Location: Wuhan City, Hubei Province
Project profile:
Wuhan Qingshan Yangtze river bridge is the eleventh Yangtze river bridge,old name is Wuhu Yangtze river bridge,it’s an important channel of 4th ring road that cross Yangtze river.it’s about 1 km from the south bank of bridge to lower reaches of WISCO trading port, the north bank reaches to the middle of Hualou Street and Shakou village,close to Huangpi District.
The bridge adopts two-way eight-lane expressway, designed speed is 100km/h,the whole line are bridges, and the roadway width is 41m to 46m, no service area,toll-gate,administration center and so on,no interchanges area, the total estimate investment is 5.148 billion RMB.
Challenge:
Lowering steel cofferdam of main bridge main pier pile cap,synchronous control 8 point 32 jack.
Solution:
Adopt intelligent CSS which is self-developed by KATTOR, make steel cofferdam rapid implantation and reach the designed position.
Applied products:
KATTOR Intelligent Continuous Strand-jack System (CSS)