JPX75 launching gantry bridge construction for precast bridge construction

JPX75 launching gantry bridge construction for precast bridge construction

Negotiable /Piece

Min.Order:1 Piece

Supply Ability:
0 Piece / Pieces per Month
Payment Terms:
T/T L/C D/P D/A
Delivery Detail:
7 days

Quick Details View All >

Brand Name:
HLCM
Place of Origin:
China
Model Number:
JP75

China Engineering Equipment Network Co.,Ltd

Business Type: Trading Company
Main Products:

Product Details

Delivery Time:4~8weeks
Certification:ISO9001: 2000

JPX75 launching gantry bridge construction for precast bridge construction

Basic Info.

Model NO.: JP75 Segmental Launching Gantry 

Type: Launching Gantry

Sling Type: Wire Rope

Power Source: Electric 

Certification: ISO9001: 2000


Feature: 
(1) Reasonable structure
(2) Favorable performance
(3) Smooth starting and stopping
(4) Safe and reliable traveling
(5) Low noise, commodious cabin and wide view
(6) Convenient maintenance, excellent exchangeability for parts and components
(7) Saves electricity 

Safety feature: 
(1) Weight overload protection device
(2) Lifting height limit device
(3)Low Voltage protection function
(4) Phase sequence protection function
(5) Emergency stop function

Control method: 
(1) Pendent line control
(2) Remote control
(3) Cabin control
(4) Choose any two together

Product Parameters:

Item

Parameters or ability

Span

50m/75m (minimum/maximum)

Working level of the whole machine

A3

Maximum longitudinal slope

+2.35%,-3.4%

Bridge transverse slope

±2%

Minimum radius of horizontal curve

2500m

Maximum lifting weight

 (not including spreader)

150t

Applicable segment length

3m, 3.55m, 1.8m

Segmental height/width

4.25m/20.8m

Maximum segmental weight

 (not including spreader)

130t

Maximum horizontal speed of 

the whole machine

0.5m/min

Longitudinal speed of

 the whole machine

0-1m/min

Maximum wind condition of 

longitudinal and horizontal movement

≤16m/s

Spreader rotation

360º

Transverse adjustment angle of spreader

±4%

Longitudinal adjustment angle of spreader

±4%

Maximum transverse adjustment

 distance of lifting trolley

±0.7m

Beam feeding type

Lift from water

Power supply requirements

380V, 50Hz, three-phase

 four-wire system to provide power

Main girder quantity/length

2/120m

Front legs quantity

1

Middle legs quantity

2

Back legs quantity

1

Auxiliary legs quantity

2

Lifting trolley quantity

2

10t crane quantity

1

Hanger

2 sets

Appearance size at working of 

the whole machine

L:120m W:11.8m H:14m

Weight of the whole machine

680t

Power of the whole machine

210kw

Application:

JP75 Precast Segmental Launching Gantry

Project name: Babahoyo River Bridge, Guayaquil City, Ecuador

Project introduction: Babahoyo River Bridge project is located in Guayas Province, Ecuador,

 it is the cross-river bridge between Duran City and Guayaquil City with total length of 2,185m, 

and there are 26 main bridge piers, it needs to set up 26-span beam segments. The whole bridge

 section includes 2.35% uphill section and 3.4% downhill section. The main bridge is a prefabricated 

suspending 75m span continuous box girder, and the bridge approach at both sides is pre stress T

 beam with 30m span.

Span combination: 3x30m+50m+25x75m+50m+4x30m=2,185m. This bridge main girder single 

arrangement 

Contact Supplier

Mr. Henry Z sale Manager Chat Now
Telephone
86-27-87779836
Mobile
86-13659870758
Fax
86-27-87745210
Skype
henry-aoc
Address
3F, Block B, Wenchang Building, International Enterprise Center, Donghu High Tech Zone, Wuhan City, Heze,Shandong

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Machinery > Plastic & Rubber Machinery > Plastic Product Making Machinery > Plastic Extruders
Categories
Hi~