Touch Screen Rotary Type Pulp Molding Production Line Forming Fruit Tray
Negotiable /Set
Min.Order:1 Set
Guangzhou Nanya Pulp Molding Equipment Co., Ltd.
Automatic Computerized Rotary Forming Pulp Molding Equipment for Egg Carton
Rotating Paper Egg Tray / Egg Carton Making Machine , Pulp Moulding Machine
Waste Paper Full Auto Rotating Type Egg Tray Forming Machinery / 5000pcs/ h
Semi Automatic Paper Pulp Molded Paper Plate Making Machine for Food Container 700 Pcs / Hour
Fully Automatic Pulp Molding Equipment , High Efficiency Egg Tray Production Line
Cup Carrier / Egg Tray Pulp Molding Equipment 3000Pcs To 6000Pcs Per Hour
Automatic Pulp Molding Rotary Type Forming Machine for Egg Tray
Specifications:
Model Type |
CZ030 |
CZ040 |
CZ050 |
CZ060 |
Forming Type |
Rotary |
Rotary |
Rotary |
Rotary |
Application |
Egg tray making |
Egg tray making |
Egg tray making |
Egg tray making |
Mould Plate Size |
1200*470mm / 8 sides |
1600*470mm / 8 sides |
2000*470mm / 8 sides |
2400*470mm / 8 sides |
Capacity |
30-packed egg tray 3000pcs/h |
30-packed egg tray 4000pcs/h |
30-packed egg tray 5000pcs/h |
30-packed egg tray 6000pcs/h |
Main Electrical elements |
Siemens |
Siemens |
Siemens |
Siemens |
Main Pneumatic Part Brand |
SMC / ARK |
SMC / ARK |
SMC / ARK |
SMC / ARK |
Descriptions:
Production Information and Our Warranty:
Competitive Advantages:
Business Terms:
NO. |
ITEM |
DESCRIPTION |
1 |
Payment Terms |
30% down payment by T/T, 70% before shipment by T/T or L/C at sight |
2 |
Delivery Terms |
FOB Guangzhou, China. (Final transaction could be made in C&F or CIF, the freight and insurance should be decided according to the current rate when signing the contract). |
3 |
Delivery Time |
60-90 days |
4 |
Packages |
Packages suitable for ocean transport. The small parts are packaged by wooden boxes. The big parts are protected by wooden support. |
5 |
Installation |
Seller should appoint 2 engineers to instruct buyer for installation, test-run and training. All the charges including air ticket, VISA , accommodation and food of the engineers should be responsible by buyer. Besides, the buyer should pay the engineers subsidy of USD50/person/day and offer translation service. |
6 |
Warranty |
12 months after installation |
7 |
After service |