Waterproof Mosaic Tiles Adhesive Safety , porcelain floor tile adhesive
Negotiable /Square Meter
Min.Order:1 Square Meter
Guangzhou Pinbang Building Material Co.,Ltd.
Heat Resistant Mosaic Tile Adhesive , Synthetic Super Tile Glue
Exterior Gravel Mosaic Tile Adhesive , Waterproof Fexible Stone Gum white
Bathroom Flexible Mosaic Tile Adhesive , White Powder Stone Glue indoor
Eco FriendlySynthetic Mosaic Tile Adhesive Super Stone For Kitchen
Grout Adhesive Mosaic Tile Adhesive Eco Friendly , ceramic wall tile adhesive
Ceramic Waterproof Mosaic Tile Adhesive , Swimming Pool Caulking Sealant
Product Name |
PB-106 Super Tile Adhesive(C2 Standard) |
Application |
Mosaic, swimming pool, outdoor wall, ground, bathroom,platform and balcony |
Feature |
Non-toxic, Eco Friendly, strong cohesion force, good anti-infiltration function, no shrink,good flexibility |
Appearance |
White, gray power |
Construction Temperature |
5℃~40℃ |
Surface Preparation |
Firm, dry and clean, no grease, no wax, or other loose materials |
Surface Dry Time |
About 2h |
PB-106 is a kind of high quality environment-friendly waterborne powder and a kind of synthetic rubber latex which can be mixed with water and used for bonding ceramic tile on the surfaces of wall, ground and floor. It is easily applied and can achieve an excellent adhesion..
Features:
PB-106 is a kind of synthetic rubber latex, mixing with the ceramic tile adhesive Ⅲ (premixed graded fine sand, special additives and synthetic resin) to form a high viscosity achieve, which can be used in all kinds of construction surface. PB-106 can also be mixed with sand and cement. The adhesive can harden without obvious shrinkage. It will not slip off when pasting a heavy ceramic tile in the vertical surface.
Operation Process:
1, Substrate Preparation
1) The substrate surface should be firm, dry and clean, no grease, no wax, or other loose materials.
2) The cement surface should not be shrinking after pasting the ceramic tile.
3) Each 1cm-thick plastering should be maintained at least 1 week.
4) Cooling the substrate when it is too hot.
2, Application of Adhesive:
1) Use a notched trowel to paste the adhesive. The general principle of choosing a correct trowel is that the coverage in the interior wall and lightloading area is at least 65~70%, while 100% in the exterior wall and overloading area.
2) Paste one layer on the surface with the flat surface of the trowel to reach a high-bond-strength effect, then choose the size of the notched trowel according to the size and type of the ceramic tile.
Typical ceramic tile |
Mosaic size≤5×5cm |
Normal ceramic tile |
Ground,plane, or the ceramic tile uneven |
Pinbang notched trowel type |
Square No.4, about 2~2.5kg/㎡ |
Type V No.5, about 3kg/㎡ |
Type V No.6, about 5kg/㎡ |
In demanding situations, such as the 300×300mm ceramic tile in exterior wall, ground, swimming pool and pool, and the ground which is overloading or need to be polished, just paste the adhesive evenly on the back of the ceramic tile(dorsal division).
3, Lay-up Ceramic tile:
1) No need to wet the ceramic tile and stone before laying, unless there is much dust on the back of the ceramic tile.
2) In order to maintain a good contact with adhesives, the ceramic tile should be pressed hard in place.
3) The open assembly time of PB-106 in normal temperature and humidity is about 20 minutes. In the conditions of adverse climatic (burning sun, dry wind, high temperature, etc.) or strong water-absorption of the surface, open assembly time may be shortened, sometimes reduced to a few minutes. So always check carefully whether the adhesive surface peeling, or whether it is still in a sticky situation. If it is peeling already, pasting the adhesive one more time. Wetting the surface before pasted the adhesive helps to extend the open assembly time.
4) Wetting the adhesive when it is peeling is not recommended, or it would form a nonstick film instead of dissolving.
5) If necessary, the seam should be adjusted within 60 minutes after laying bricks.
6) It can not be washed or in the rain within 24 hours after laying bricks, and avoid placing in cold or exposed situation for 5~7 days.
4, Jointing:
1) Fill the wall seam