perfect Auto Climbing Hydraulic Formwork Bracket for viaduct and across - sea bridge
Negotiable /Set
Min.Order:1 Set
Beijing Yunhai Construction Hardware Co.,Ltd
adjustable Table climbing Formwork system with plywood 18mm skin For slab casting
Steel hydraulic climbing formwork brancket form tie for high rise tower
ZPM-100 oil cyclinder Auto-climbing Formwork system for dam, high building 100 meters
QPMX-50 steel rail Auto-climbing formwork with One oil cylinder unit can lift 50KN
pull-push prop type Automatic Climbing Formwork for dam, high building
high safety Hydraulic Climbing Formwork System with High loading capacity
perfect Auto Climbing Hydraulic Formwork Bracket for viaduct and across - sea bridge
Hydraulic climbing system is a perfect formwork system for the high rise tower, viaduct and across-sea bridge.Induction
The hydraulic pump and the oil cylinder are the main drive for the climbing system. Drove by the hydraulic cylinder, the rail and the bracket can move upward separately and then the whole system climbs up wholly, through this alternation of the rail and the bracket accreting on the wall, they lift each other along the wall floor by floor, The climbing system is very easy to operate as there is no other lifting machine needed. And this is the ideal formwork system especially for high rise buildings.
Advantages
The hydraulic climbing system includes: climbing system, bracket system, formwork and handle platform.
With a good stability, the Hydraulic climbing formwork can climb up wholly or separately.
Easy and quick operation; high safety; work and material saving.
High loading capacity allows more materials packed on the working platform(as per designed).
Climbing fast can save you a lot of time.
We provide all operating platforms which save your work and material.
Application
Hydraulic climbing system is a perfect form system for the high rise tower, viaduct and across- sea bridge, etc..
Climbing Process
A: Place concrete, when the strength meets the design requirement, then remove the formwork;
B: Install the anchor load-bearing equipment, lift the rail by the hydraulic equipment;
C: Remove the under anchor load-bearing equipment for next time using, lift the bracket by the hydraulic equipment;
D: Tie up the rebar sand install the anchor;
E: Move the formwork, connect the high tension split tie-rod;
F: Move the formwork, connect the tensile split bolt.