Auto independent Self Climbing Formwork with Auto-climbing Protection Panel PS50

Auto independent Self Climbing Formwork with Auto-climbing Protection Panel PS50

Negotiable /Unit

Min.Order:1 Unit

Supply Ability:
0 Unit / Units per Month
Payment Terms:
T/T L/C D/P D/A
Delivery Detail:
7 days

Quick Details View All >

Brand Name:
Yunhai
Place of Origin:
China
Model Number:
QPMX-50

Beijing Yunhai Construction Hardware Co.,Ltd

Business Type: Trading Company
Main Products: Climbing Formwork

Product Details

Delivery Time:5-28days
Certification:CE,ISO,FCC

Auto independent Self Climbing Formwork with Auto-climbing Protection Panel PS50

Descrition: 

The lifting power of the Formwork QPMX-50 comes from its hydraulic system, which includes the oil cylinder 

and commutator. Through functioning of hydraulic system, the steel rail and bracket can climb up alternately, 

so the whole formwork system climbs steadily, independent of a crane. It\' s easy to operate, and climbing is fast and safe.

Structure 

The Characteristics 


1. One oil cylinder unit can lift 50KN.
2. The QPMX-50 system can climb not only vertically but also slantwise, and the forward or backward inclination 

can be up to 18 degrees.
3. The system can climb up wholly or separately. The climbing process is steady, synchronous and safe.
4 .The bracket does not come back to the ground until construction work is finished, and spacing for work is reduced

 while the bumping damage is almost completely prevented, especially for the plywood.
5.The error of structure construction is tiny and easy to correct.
6.The formwork can climb up by itself and cleaning work can be done in situ. The number of crane lifts are greatly reduced.

Standard Climbing Process 


1.Set up the formwork by wall-through tie-rods and pull-push props, embed anchors and do the first concrete pouring.
2. Remove the formwork after the first pouring and fix anchor shoes on the finished wall, lift the brackets and formwork

 to the right position, match the formwork and do the second pouring.
3.Lift formwork and brackets to the higher floor; fix climbing rail and hydraulic system.
4.Match the formwork to the right position and do the third pouring.
5.Strip the formwork and fix anchor shoes on the finished wall, then let the climbing rails climb.
6. Brackets climb up to the right position, then install suspended platform.
7.Match the formwork, do the concrete pouring, and proceed into the standard climbing stage.
 

 Illustration of Verticle Climbing

 

 Sketches of inclined climbing        

Project Application 

Project Name:City of Lights C10a (Abu Dhabi, UAE)

Contractor:CSCEC

ZULIN Products in Use:QPMX-50, Auto-climbing Protection Panel PS50

 
 

Contact Supplier

Mr wang Chat Now
Telephone
86-10-5214688
Mobile
86-105214688
Fax
86-10-5214688
Address
No. 449, Wucao Road, Qingfang Apparel Park,Tongzhou Zibo,Shandong

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Machinery > Engineering & Construction Machinery > Road Machinery > Pavers
Categories
Hi~