360 Rotation 12 meters Electric Motor boom electric forklift platforms equipment
Negotiable /Piece
Min.Order:1 Piece
Hangzhou Diaotian Machinery & Equipment Co.,Ltd
1-15m 220v 0.5 - 30t Load automatsd Self-propelled electric scissor fork mobile lifting platform
custom Full automatic Self-propelled electric scissor fork mobile lifting / lift platform
custom 2.2kw 8 meters Full automatic Self-propelled Electric scissor lifting platform
6m single mast vertical platform small scissor lifting table equipment platform for hotels, banks
360 14M Diesel Engine Electric hydraulic movable lifting Aerial Work Platform
12m hydraulic Electric heavy duty scissor arm lifting platform Diesel Engine lifting equipments
GKT-12 Diesel Engine/220V(380V) Electric Motor double used Aerial Working Platform
Double used aerial work platform is diesel engine powered or 380V electrically powered. Walking operation powered by diesel engine,lifting operation powered by diesel engien& 220V (380V)electricity.With full-automatic hydraulic legs and articulated booms , it can be self-propelled, can be operated up and down, turn around 360°. If you want it to work without noise, you can stop the diesel engine and instead start it with 380V electricity. It is suitable for working insider.
Specifications
Model |
GKT-12 |
Rotation angle |
360° |
Max.Working height(m) |
12 |
Max.platform height (m) |
10.5 |
Platform Capacity (kg)(2persons) |
200 |
Total weight(kg) |
1900 |
External dimensions(mm) |
3900×1900×2600 |
Max.Working radius(m) |
3.4 |
lift speed(m/s) |
0.05-0.09 |
Travel speed(km/h) |
15-30 |
Wind-resistant force |
≤5 |
Working pressure(Mpa) |
10 |
Power(KW) |
1.5 |
Voltage(V) |
380 |
Warranty:
1. The warranty period of our products is 1 year from purchase.
2.If our products have quality problems, within the warranty periods, all repairs are free of charge.
3.This warranty does not cover unauthorized modification ,Artificial factor.
Minimum Order: 1 SET
Packaging: Plastic Film Packaging (free)
Terms of Payment: 30% payment of total value within 05 days after signing the contract by T/T within 07 days before the shipment.
Delivery Time: Within 30working days after the confirmation of the GKT-12 Aerial Work Platform.
Shipping Method: By Sea.
Partial Shipment is not allowed.
Trans Shippment is not allowed.
12 meters Diesel Engine/220V(380V) Electric Motor double used can avoid obstacles boom lift platforms