12m hydraulic Electric heavy duty scissor arm lifting platform Diesel Engine lifting equipments
Negotiable /Cubic Meter
Min.Order:1 Cubic Meter
Hangzhou Diaotian Machinery & Equipment Co.,Ltd
Wind-resistant 13m Dual powered Diesel Engine hydraulic arm lifting platform
industrial lifts Electric Motor Aerial lifting Working devices platforms equipment
ZLP 1000 Rope Suspended Platform with wall rollers 630kg load for Window cleaning
ZLP 250 stainless steel Rope Suspended suspended work platforms 250kg load
10M Safe ZLP630 Aluminium Alloy Rope Suspended Window Cleaning Platform Cradle Swing Stage
ZLP Aluminium Power Wire Rope Suspended Platform, Building Aerial Work Scaffold Equipment
GKT-12 Diesel Engine/220V(380V) Electric Motor double used Aerial Working Platform
Double used aerial work platform is diesel engine powered or 380V electrically powered. Walking operation powered by diesel engine,lifting operation powered by diesel engien& 220V (380V)electricity.With full-automatic hydraulic legs and articulated booms , it can be self-propelled, can be operated up and down, turn around 360°. If you want it to work without noise, you can stop the diesel engine and instead start it with 380V electricity. It is suitable for working insider.
Specifications
Model |
GKT-12 |
Rotation angle |
360° |
Max.Working height(m) |
12 |
Max.platform height (m) |
10.5 |
Platform Capacity (kg)(2persons) |
200 |
Total weight(kg) |
1900 |
External dimensions(mm) |
3900×1900×2600 |
Max.Working radius(m) |
3.4 |
lift speed(m/s) |
0.05-0.09 |
Travel speed(km/h) |
15-30 |
Wind-resistant force |
≤5 |
Working pressure(Mpa) |
10 |
Power(KW) |
1.5 |
Voltage(V) |
380 |
Warranty:
1. The warranty period of our products is 1 year from purchase.
2.If our products have quality problems, within the warranty periods, all repairs are free of charge.
3.This warranty does not cover unauthorized modification ,Artificial factor.
Minimum Order: 1 SET
Packaging: Plastic Film Packaging (free)
Terms of Payment: 30% payment of total value within 05 days after signing the contract by T/T within 07 days before the shipment.
Delivery Time: Within 30working days after the confirmation of the GKT-12 Aerial Work Platform.
Shipping Method: By Sea.
Partial Shipment is not allowed.
Trans Shippment is not allowed.