hot melt EVA adhesive manufacturing plant and full line

hot melt EVA adhesive manufacturing plant and full line

USD $20,000 - $100,000 /Set

Min.Order:1 Set

Supply Ability:
2 Set / Sets per Month
Port:
Qingdao
Payment Terms:
T/T

Quick Details View All >

Product Type:
Other, hot melt glue making machine
Place of Origin:
Shandong, China
Brand Name:
YD
Model Number:
YD-001
After-sales Service Provided:
Engineers available to service machinery overseas

Laizhou Yuanda Chemical Industry Machinery Factory

Business Type: Manufacturer,Trading Company
Yantai Shandong China
Main Products: Plastic Machinery SMC Production Line ,Chemical Industry Machinery Reactor ,Kneading Machine ,High Speed Dispersing Mixer ,Hot Melt Glue Pellet / Stick Plant

Product Details

Specifications

hot melt EVA adhesive manufacturing plant and full line
hot melt glue type: stick,round granules, pillow granules.
top qualit

hot melt EVA adhesive manufacturing plant and full line

 

 

Product Description

 

  

 

1,Product Introduction: 

 

hot melt glue granules making machine:

 

1,screw horizontal mixer 

2,extruder 

3,tractor  

4,conveyor in water basin

5,cutter machine

  1. The line can produce various type of hot melt adhesive sticks
  2. Hot melt adhesive sticks applies to handicraft,electrical appliances,clothing,toys and so on
  3. The device doesn’t need reactor,it not only saves equipment,but also improves the product quality
  4. It can continuous production, overcomes the disadvantage of mixing uneven and poor transparency of reactor
  5. Save energy
  6. One-step of reaction and extrusion to produce
  7. The screw of the main machine by special design
  8. Good mixed , smooth surface, good diaphaneity, uniform specifications
  9. It is the most advanced technology of producing hot melt adhesive stick.
  10.  Provide production formula and go to the buyer’s country to install and trial run the machine after buying the machine

 

 

The hot melt adhesive line include:

 

 1.  Glue bar line through training application has experienced staff General host not allowed in the empty machine running or not under heat, not charging circumstances Avoid screw and tube occurs scratches In the case of power outage, not in the plane cylinder should be stipulated in restarting the temperature, the first after heating tube screw to any specified temperature to avoid twisting screw, damage to the gearbox cause accidents.

2.  Due to high temperature to thrust bearing grease filling moC2 (variable) should always check, and a crate when added new gearoil to ensure the normal operation of machine with the using life

 

 3.  Mixing materials, processing in cold mix should pay attention: raw material should be clean, without sundry, defend metal, sand, small tools and other sundry raw materials, mixing with the name, influence the quality of the products, the production equipment is found in the process of inspection and repair of abnormal should stop

 

 4.  Traction cooling unit

  In the production of rubber bar from entering traction stage, drawer shall be transferred to amount to squeeze, to ensure the glue stick synchronization, often should for filling in the engine cooling water pump, sew to check, cooling water to replace frequently maintain clean. Electrical no extremes of case motor disorders

 

5.  Cutting machine
Cutting machines in operation should be in the transmission part filling oil, ensure smooth transmission, special attention in the nearby operators must pay attention to safety

 

 

 Paramaters:

 

Project nameUnit Model
Screw diametermm90
Lenth-diameter radioLD321
Rod thicknessMM8--20
Extrusion quantityBar2
OutputKgh80-110
Moter powerKW18.5
Firstly assist powerKW1.5
Secondly assist powerKW1.5
Heating powerKW23
Dimension(lenth*width*hhight)m28*2*2.6

 

 

Product Pictures:

hot melt EVA adhesive manufacturing plant and full line

 

hot melt EVA adhesive manufacturing plant and full linehot melt EVA adhesive manufacturing plant and full linehot melt EVA adhesive manufacturing plant and full linehot melt EVA adhesive manufacturing plant and full linehot melt EVA adhesive manufacturing plant and full linehot melt EVA adhesive manufacturing plant and full line

 

hot melt EVA adhesive manufacturing plant and full line

 

 

 

Product Shows:

 

 

1,hot melt glue for bookbinding:

hot melt EVA adhesive manufacturing plant and full line

2,hot melt glue for wood furniture:

 

hot melt EVA adhesive manufacturing plant and full line

 

 

3,hot melt glue for shoe sole:

hot melt EVA adhesive manufacturing plant and full line

 

4,other products:

 

hot melt EVA adhesive manufacturing plant and full linehot melt EVA adhesive manufacturing plant and full linehot melt EVA adhesive manufacturing plant and full line

 

 

 

 

Company Information

 

  

Company Information:

Laizhou Yuanda Chemical Industry Machinery Co., Ltd is located in the beautiful and fertile Bohai Bay which is the hub of Yantai, Qingdao and Weifang.By virtue of convenient and good location, it is a perfect place for trade business.

The company integrates scientific research, development, production,sales and after-sales service. It owns a group of specialists having rich experience in machinery designing, developing and management.Based on reasonable structure,good durability and easy operation,etc.

Our factory can manufacture a lot of chemical ang industry machines,like: reactor, disperser, mixer, sand mill, colloid mill, SMC sheet machine, resin production line, paint production line, hot melt glue production line, floral foam production line, etc.

 

 

 

 

 

Our Services

 

  

Our service:

1,Reply your enquiry in 24 working hours.

2,Experienced staffs answer all your questios in professional and fluent English.

3,Customized design is available.

4,Exclusive and unique solution can be provided to our customer by your our well-trained and professional engineers staffs.

 

 

  

 

 

 

FAQ

 

  

FAQ:

 

About Delivery time

 

Q-----What’s the delivery term for making business with us?

 

A-----Usually we send tne shipments in FOB term.However, the terms of CIF are acceptable which depend on the preference of clients.

 

 

 

About Lead Time

 

Q------What’s the lead time after placing thr order?

 

A------Usually it takes about 25~30 days after we received your confirmation.

 

     However, it would depend on our production line schedule(the timing clients place order)and the complication of the item.

 

 

 

About Payment Term

 

Q------What’s the Payment Term?

 

A------By T/T in Advance, or Irrevocable L/C as Sight.

 

 

Our machines can be customized, leave an inquiry to know more details about price, packing, shiping and price.

 

Send your message to this supplier:

 

 

 

hot melt EVA adhesive manufacturing plant and full line

Contact Supplier

Mr. Xiaobin Liu Chat Now
Telephone
86-535-2357998
Mobile
0086-18561523890
Fax
86-535-2343988
Address
West Sungezhuang country, Shahe Town Shandong

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Machinery > Chemical & Pharmaceutical Machinery > Chemical Machinery & Equipment > Other Chemical Equipment
Categories
Hi~