Assembly Walk Board Metal Steel Plank And Complete Scaffolding Parts Required

Assembly Walk Board Metal Steel Plank And Complete Scaffolding Parts Required

USD $8 - $8 /Piece

Min.Order:1000 Pieces

Supply Ability:
100000 Piece / Pieces per Month
Port:
QingDao
Payment Terms:
T/T Credit Card

Quick Details View All >

Place of Origin:
Shandong, China
Brand Name:
QUEEN
Model Number:
Assembly Walk Board

Linyi Queen Imp. & Exp. Co., Ltd.

Credit Member 4 years
Business Type: Trading Company
Linyi Shandong China
Main Products: Ringlock Scaffolding ,Cuplock Scaffolding ,Props Scaffolding ,Frame Scaffoldign ,Scaffolding Tools

Product Details

Assembly Walk Board Metal Steel Plank And Complete Scaffolding Parts Required

The general single-tube column scaffold bears capacity of up to 10kN ~ 35kN ,when the scaffolding geometry and structure is compliant with the relevant requirements. Steel walk board planks easy disassembly, erection and flexible .Easy to adjust the length of the tube, fastener connection is simple, and thus can adapt to all kinds of plane, elevation of buildings and structures with the scaffold. Steel walk board planks compare with the economy.Processing is simple, a relatively low investment costs; if well-designed scaffolding geometry, focus on improving working capital utilization rate of steel, the material consumption can be achieved better economic results. Fastening steel frame construction steel per square meter equivalent to about 15 kg.

Our Advantages:

1. Have larger capacity . The general single-tube column scaffold bears capacity of up to 10kN ~ 35kN ,when the scaffolding geometry and structure is compliant with the relevant requirements.

2. Steel walk board planks easy disassembly, erection and flexible .Easy to adjust the length of the tube, fastener connection is simple, and thus can adapt to all kinds of plane, elevation of buildings and structures with the scaffold.

3. Steel walk board planks compare with the economy.Processing is simple, a relatively low investment costs; if well-designed scaffolding geometry, focus on improving working capital utilization rate of steel, the material consumption can be achieved better economic results. Fastening steel frame construction steel per square meter equivalent to about 15 kg.

Description

Product Assembly Walk Board Metal Steel Plank And Complete Scaffolding Parts Required
MaterialQ195-Q235
Width210,225,240,250,420,480,500mm
Thickness1.0-4.0mm
Surfaceblack phosphating,pear nickel,bright chrome plated,black electrophoresis,black sand powder coated or customized
TechincalHeat treatment . Forged ,Cold-Forming .Polishing.Grinding.Chrome plating
Lengthas customer's requirement
Terms of payment30% deposit then pay balance after received copy of B/L or L/C at sight
Deliverywithin 20 days after received deposit or L/C
Packagepacked in bulk or in bundles, as per client's request (generally in 40'HQ)
Production capacity5,000 tons per month

Specifications

210mm PlankWeight(kg)240mm PlankWeight(kg)
210*45*1.0*1000mm3.15240*45*1.0*1000mm3.65
210*45*1.0*2000mm5.96240*45*1.0*2000mm6.49
210*45*1.0*3000mm8.78240*45*1.0*3000mm9.55
210*45*1.0*4000mm11.59240*45*1.0*4000mm12.61
210*45*1.1*1000mm3.41240*45*1.1*1000mm3.72
210*45*1.1*2000mm6.49240*45*1.1*2000mm7.06
210*45*1.1*3000mm9.56240*45*1.1*3000mm10.41
210*45*1.1*4000mm12.63240*45*1.1*4000mm13.75
210*45*1.2*1000mm3.67240*45*1.2*1000mm4.01
210*45*1.2*2000mm7.01240*45*1.2*2000mm7.63
210*45*1.2*3000mm10.35240*45*1.2*3000mm11.26
210*45*1.2*4000mm13.68240*45*1.2*4000mm14.89
250mm PlankWeight(kg)Plank with hook
250*50*1.0*1000mm3.69SpecificationWeight(kg)
250*50*1.0*2000mm6.92
250*50*1.0*3000mm10.15420*45*1.1mm12.75
250*50*1.0*4000mm13.38420*45*1.2mm13.68
250*50*1.1*1000mm6.96450*45*1.0mm11.1
250*50*1.1*2000mm7.52450*45*1.1mm12.75
250*50*1.1*3000mm11.05480*45*1.0mm12.56
250*50*1.1*4000mm14.58480*45*1.1mm13.64
250*50*1.2*1000mm4.29480*45*1.2mm14.64
250*50*1.2*2000mm8.12500*50*1.0mm13.1
250*50*1.2*3000mm11.95500*50*1.1mm14.26
250*50*1.2*4000mm15.78500*50*1.2mm15.29

 

Galvanized walk board

 Assembly Walk Board Metal Steel Plank And Complete Scaffolding Parts Required

 

Walk board with hooks

Assembly Walk Board Metal Steel Plank And Complete Scaffolding Parts Required

We are producing

Assembly Walk Board Metal Steel Plank And Complete Scaffolding Parts RequiredAssembly Walk Board Metal Steel Plank And Complete Scaffolding Parts Required

 

Walk board used in ringlock

Assembly Walk Board Metal Steel Plank And Complete Scaffolding Parts Required

Our package show

Assembly Walk Board Metal Steel Plank And Complete Scaffolding Parts RequiredAssembly Walk Board Metal Steel Plank And Complete Scaffolding Parts Required

 

Three modes of transportation can be available: land transportation, railway transportation

and sea transportation (shipping at Qingdao).

Our Service:

1.Your inquiry related to our product & price will be replied within 24hours.

2.Well-trained &experienced staff are to answer all your inquiries professional in English of

course.

3.Working time: 8:00am - 5:30pm, Monday to Friday. OEM is highly welcomed.

4.We have strong R&D team here to help.

5.Your business relationship with us will be confidential to any third party.

6. Good after-sale service offered, please get back if you got question. 

Contact Supplier

Mr. Feeling Lau Sales Manager Chat Now
Telephone
86-0539-7977907
Mobile
0086-15866928686
Fax
86-0539-2800891
Address
1712 IEC Shanghai Road Lanshan District Linyi,Shandong

You May Like

New Products

Find Similar Products By Category

Construction & Real Estate > Ladders & Scaffoldings > Scaffoldings
Categories
Hi~