Scaffolding Perforated Walking Plank Used for Frame
USD $8 - $8 /Piece
Min.Order:1000 Pieces
Linyi Queen Imp. & Exp. Co., Ltd.
Steel Walk Board Steel Planks Walk Catwork Standards Scaffolding Planks Used For Construction
Stainless Steel Material and galvanized platform used in scaffolding/walk board/steel plank
safe durable scaffolding deck, scaffolding board steel plank
metal scaffolding plank walking board for construction building
Scaffolding Perforated Walking Plank Used for Frame
The general single-tube column scaffold bears capacity of up to 10kN ~ 35kN ,when the scaffolding geometry and structure is compliant with the relevant requirements. Steel walk board planks easy disassembly, erection and flexible .Easy to adjust the length of the tube, fastener connection is simple, and thus can adapt to all kinds of plane, elevation of buildings and structures with the scaffold. Steel walk board planks compare with the economy.Processing is simple, a relatively low investment costs; if well-designed scaffolding geometry, focus on improving working capital utilization rate of steel, the material consumption can be achieved better economic results. Fastening steel frame construction steel per square meter equivalent to about 15 kg.
Our Advantages:
1. Have larger capacity . The general single-tube column scaffold bears capacity of up to 10kN ~ 35kN ,when the scaffolding geometry and structure is compliant with the relevant requirements.
2. Steel walk board planks easy disassembly, erection and flexible .Easy to adjust the length of the tube, fastener connection is simple, and thus can adapt to all kinds of plane, elevation of buildings and structures with the scaffold.
3. Steel walk board planks compare with the economy.Processing is simple, a relatively low investment costs; if well-designed scaffolding geometry, focus on improving working capital utilization rate of steel, the material consumption can be achieved better economic results. Fastening steel frame construction steel per square meter equivalent to about 15 kg.
Product | Scaffolding Perforated Walking Plank Used for Frame |
Material | Q195-Q235 |
Width | 210,225,240,250,420,480,500mm |
Thickness | 1.0-4.0mm |
Surface | black phosphating,pear nickel,bright chrome plated,black electrophoresis,black sand powder coated or customized |
Techincal | Heat treatment . Forged ,Cold-Forming .Polishing.Grinding.Chrome plating |
Length | as customer's requirement |
Terms of payment | 30% deposit then pay balance after received copy of B/L or L/C at sight |
Delivery | within 20 days after received deposit or L/C |
Package | packed in bulk or in bundles, as per client's request (generally in 40'HQ) |
Production capacity | 5,000 tons per month |
Specifications
210mm Plank | Weight(kg) | 240mm Plank | Weight(kg) |
210*45*1.0*1000mm | 3.15 | 240*45*1.0*1000mm | 3.65 |
210*45*1.0*2000mm | 5.96 | 240*45*1.0*2000mm | 6.49 |
210*45*1.0*3000mm | 8.78 | 240*45*1.0*3000mm | 9.55 |
210*45*1.0*4000mm | 11.59 | 240*45*1.0*4000mm | 12.61 |
210*45*1.1*1000mm | 3.41 | 240*45*1.1*1000mm | 3.72 |
210*45*1.1*2000mm | 6.49 | 240*45*1.1*2000mm | 7.06 |
210*45*1.1*3000mm | 9.56 | 240*45*1.1*3000mm | 10.41 |
210*45*1.1*4000mm | 12.63 | 240*45*1.1*4000mm | 13.75 |
210*45*1.2*1000mm | 3.67 | 240*45*1.2*1000mm | 4.01 |
210*45*1.2*2000mm | 7.01 | 240*45*1.2*2000mm | 7.63 |
210*45*1.2*3000mm | 10.35 | 240*45*1.2*3000mm | 11.26 |
210*45*1.2*4000mm | 13.68 | 240*45*1.2*4000mm | 14.89 |
250mm Plank | Weight(kg) | Plank with hook | |
250*50*1.0*1000mm | 3.69 | Specification | Weight(kg) |
250*50*1.0*2000mm | 6.92 | ||
250*50*1.0*3000mm | 10.15 | 420*45*1.1mm | 12.75 |
250*50*1.0*4000mm | 13.38 | 420*45*1.2mm | 13.68 |
250*50*1.1*1000mm | 6.96 | 450*45*1.0mm | 11.1 |
250*50*1.1*2000mm | 7.52 | 450*45*1.1mm | 12.75 |
250*50*1.1*3000mm | 11.05 | 480*45*1.0mm | 12.56 |
250*50*1.1*4000mm | 14.58 | 480*45*1.1mm | 13.64 |
250*50*1.2*1000mm | 4.29 | 480*45*1.2mm | 14.64 |
250*50*1.2*2000mm | 8.12 | 500*50*1.0mm | 13.1 |
250*50*1.2*3000mm | 11.95 | 500*50*1.1mm | 14.26 |
250*50*1.2*4000mm | 15.78 | 500*50*1.2mm | 15.29 |
Galvanized walk board
Walk board with hooks
We are producing
Walk board used in ringlock
Our package show
Three modes of transportation can be available: land transportation, railway transportation
and sea transportation (shipping at Qingdao).
Our Service:
1.Your inquiry related to our product & price will be replied within 24hours.
2.Well-trained &experienced staff are to answer all your inquiries professional in English of
course.
3.Working time: 8:00am - 5:30pm, Monday to Friday. OEM is highly welcomed.
4.We have strong R&D team here to help.
5.Your business relationship with us will be confidential to any third party.
6. Good after-sale service offered, please get back if you got question.