2015 Jinhua heSheng the most Popular ATV Ramp with Good Quality and Patent Trade Assurance MR2
USD $1 - $32 /Piece
Min.Order:100 Pieces
Jinhua Hesheng Metal Produce Co., Ltd.
2015 heSheng the most Popular ATV Ramp with Good Quality and CE approved Trade Assurance MR2
2015 heSheng Sale Well Aluminum ATV Ramp with Super Quality and CE approved Trade Assurance MR1
2015 heSheng the most Popular Foldable ATV Ramp with High Quality Trade Assurance MR1
2015 heSheng the most Popular Foldable ATV Ramp with High Quality MR10
2015 heSheng the most Popular Foldable ATV Ramp with High Quality MR9
2015 heSheng the most Popular Foldable ATV Ramp with Super Quality MR8
2015 Jinhua heSheng the most Popular ATV Ramp with Good Quality and CE approved and Patent Trade Assurance:
Product details:
Name: | ATV Ramp |
Item No.: | HS-MR2 |
Material: | 6061 aluminum |
Folding Size: | 101*19*10cm/39.76*7.48*3.94inch |
Shape | flat shape with rungs |
Max Load: | 180kgs/400lbs |
N.W.: | 7.1kg |
G.W.: | 8.3kg |
Packing Size: | 103*21*22cm/40.55*8.27*8.66inch |
Qty.: | 2pcs |
Color: | Silver,Black, Red, Blue, Green, Orange ,Yellow etc. |
Product adventages:
Features: | 1.The new V-Ramp is made of a high quality aircraft aluminum. |
Quality: | Hesheng quality level for middle and high market. |
Work: | for Moto Bike up and down etc. |
Others (price, package and service):
Export Port: | Ningbo or Shanghai |
Packing: | 1pc or 2pcs into a five layer double corrugated export carton |
Delivery date: | Normally in 20-40days. |
MOQ: | 1,00 pcs |
Supply Ability: | 8,000 pcs per month. |
Payment Term: | T/T, L/C or others for negotiation. |
About us:
We are one of leading manufacturer with motor sport products in china.
It has more than 15years experience.
Main Products: 1) Motorcycle Stand
2) Racing Front &Rear Stand
3) Wheel Chock/ Paddock stand
4) ATV Stand
5) Lift Stand
6) Ramp
7) Tire Changer&Balancer
8) Tool Box &Garage Accessories
Warmly welcome to visit and cooperate with our factory from all over the world.
Sample Delivery: within 5working days.
New Product Development: within 1-2 Months to be finished.
Stamp Workshop:
Assemble Workshop: