2015 heSheng the most Popular Foldable ATV Ramp with Super Quality MR8
USD $1 - $32 /Piece
Min.Order:100 Pieces
Jinhua Hesheng Metal Produce Co., Ltd.
2015 heSheng the most Popular Foldable ATV Ramp with High Quality MR7
2015 heSheng the most Popular Foldable ATV Ramp with High Quality MR6
2015 heSheng the most Popular Foldable ATV Ramp with High Quality MR5
2015 heSheng the most Popular Foldable ATV Ramp with High Quality MR4
2015 heSheng the most Popular Foldable ATV Ramp with High Quality MR3
2015 heSheng the most Popular Foldable ATV Ramp with High Quality MR2
2015 heSheng the most Popular Foldable ATV Ramp with Super Quality :
Product details:
Name: | ATV Ramp |
Item No.: | HS-MR8 |
Material: | 6061 aluminum |
Folding Size: | 114*28.5*15cm/44.88*11.22*5.90inch |
Shape | flat shape with rungs |
Max Load: | 300kgs/650lbs |
N.W.: | 7.2kg |
G.W.: | 8kg |
Packing Size: | 116*30*15cm/45.67*11.81*5.90inch |
Qty.: | 1pc |
Color: | Silver,Black, Red, Blue, Green, Orange ,Yellow etc. |
folding motorcycle ramp | ramps | moto ramps for sale | motorcycle loading ramps | Motorrad-Rampe | aluminum motorcy | Aluminum 7.0FT Folding V Ramp | rampa de moto | motocicleta rampa | motorcykel rampe | jalan Product adventages:
Features: | 1.The new V-Ramp is made of a high quality aircraft aluminum. |
Quality: | Hesheng quality level for middle and high market. |
Work: | for Moto Bike up and down etc. |
Others (price, package and service):
Export Port: | Ningbo or Shanghai |
Packing: | 1pc into a five layer double corrugated export carton |
Delivery date: | Normally in 20-40days. |
MOQ: | 1,00 pcs |
Supply Ability: | 8,000 pcs per month. |
Payment Term: | T/T, L/C or others for negotiation. |
About us:
We are one of leading manufacturer with motor sport products in china.
It has more than 15years experience.
Main Products: 1) Motorcycle Stand
2) Racing Front &Rear Stand
3) Wheel Chock/ Paddock stand
4) ATV Stand
5) Lift Stand
6) Ramp
7) Tire Changer&Balancer
8) Tool Box &Garage Accessories
Warmly welcome to visit and cooperate with our factory from all over the world.
Sample Delivery: within 5working days.
New Product Development: within 1-2 Months to be finished.
Stamp Workshop:
Assemble Workshop: