2015 Led Champagne Ice Bucket Patio Outdoor Colorful Led Ice Bucket
Negotiable /Piece
Min.Order:1 Piece
Shenzhen XGC Environmental Technology Co., Ltd.
2015 hot sale plastic led ice bucket / ice container / beer barrel
China Wholesale Popular Led Flashing Ice Bucket led beer bucket for party
hot waterproof plastic RGB led pot led small ice bucket holder
2015 New arrival battery operated LED illuminated square wine cooler plastic beer bucket
Illumianted waterproof led rechargeable li battery operated led ice bucket/wine cooler
2015 Led Champagne Ice Bucket Patio Outdoor Colorful Led Ice Bucket:
Production Description:
2015 Led Champagne Ice Bucket Patio Outdoor Colorful Led Ice Bucket
Item No.:GH202 |
Material: PE (polyethylene) + Built –in LED lights |
Size:120*40*40cm |
Control: Remote Control via Remote |
Power supply: 100-240V 50.60Hz (OUTPUT: 5 V 1A) |
Battery: 4400mAh, 3.7V rechargeable lithium battery |
Charge time: 6-8 hours , Lasting Time: 12 ~ 14 Hours |
LED Life: ≥ 50,000 hours |
Working temperature: 0 - 50 °C |
More photos:
Accessories & Certificates:
1. Adaptor
2. Remote
3. Certificates
Packing & Shipping:
Our product series:
1.Furniture:
Main products: table, chair, stool,sofa, wine cabinet
2.Furnishing:
Main products: fruit plate/food plate,ice bucket,wine cooler,pillow,table cover,chair cover,curtain
3.Decorations:
Main products: flower pot/ vase.ball, pillar,decoration lights, decoration trees, Christmas decorations
Application:
Hotels& entertainment: bar, coffee ship, banquet hall, party, club
Outdoor leisure place: Garden, park, pool, beach, tourist attractions, public
Commercial center: Exhibition, mall, office, Wedding photography studio, conference room
Company information:
1.We are Professional LED PE furniture manufacturer since 2007 in China.
2.Modern style: With rich experience R&D team, and develop new styles to satisfy customers for each year.
3.High quality: With best SMD5050 led RGB lights, which is with soft light and long lifespan. and our battery is 4400MAH rechargeable lithium battery, it can be running about 10 ~12 hours
4.Favorable price: With advanced equipment to improve working efficiency and reduce production cost.
5.Prompt delivery: 7-20 days (our normal mass production time is about 20 days, we can adjust the delivery time as per customer's demands)
6.Certificates: CE,ROHS,UL