Led Light ice Bucket ice Container Beer Barrel
Negotiable /Piece
Min.Order:1 Piece
Shenzhen XGC Environmental Technology Co., Ltd.
big PE plastic made gowing LED bottle ice bucket,led bottle cooler for bar and pub
wine glass storage rack/wall mounted wine bottle holder/wine display stand/wine rack
wine glass rack/adjustable wine rack/plastic portable wine racks
2016 new product fancy wll wine racks/bar furniture bar decor wall mounted wine rack
refrigerator wine rack/hanging wine rack/commercial wine rack
Led Light ice Bucket ice Container Beer Barrel:
Production Description:
LED lighting up cooler plate RGB LED Ice Fruit Plate ice bucket for bar: |
Item No.:GH201 |
Material: PE (polyethylene) + Built –in LED lights |
Size:75*45*45cm |
Control: Remote Control via Remote |
Power supply: 100-240V 50.60Hz (OUTPUT: 5 V 1A) |
Battery: 4400mAh, 3.7V rechargeable lithium battery |
Charge time: 6-8 hours , Lasting Time: 12 ~ 14 Hours |
LED Life: ≥ 50,000 hours |
Working temperature: 0 - 50 °C |
More photos:
Accessories & Certificates:
1. Adaptor
2. Remote
3. Certificates
Packing & Shipping:
Our product series:
1.Furniture:Main products: table, chair, stool,sofa, wine cabinet
2.Furnishing:Main products:fruit plate/food plate,ice bucket,wine cooler,pillow,table cover,chair cover,curtain
3.Decorations:Main products:flower pot/vase.ball,pillar,decoration lights,decoration trees,Christmas decoration
Application:
Hotels& entertainment: bar, coffee ship, banquet hall, party, club
Outdoor leisure place: Garden, park, pool, beach, tourist attractions, public
Commercial center: Exhibition, mall, office, Wedding photography studio, conference room
Company information:
1.We are Professional LED PE furniture manufacturer since 2007 in China.
2.Modern style: With rich experience R&D team, and develop new styles to satisfy customers for each year.
3.High quality: With best SMD5050 led RGB lights, which is with soft light and long lifespan. and our battery is 4400MAH rechargeable lithium battery, it can be running about 10 ~12 hours.
4.Favorable price: With advanced equipment to improve working efficiency and reduce production cost.
5.Prompt delivery:7to20 days(our normal mass production time is about 20 days,we can adjust the delivery time as per customer's demands).
6.Certificates:CE,ROHS,UL.