waste plastic pyrolysis machine made by professional manufature
USD $20,000 - $45,000 /Set
Min.Order:1 Set
Xinxiang City Jinzhen Machinery Manufacturing Co., Ltd.
waste plastic pyrolysis machine
We mainly specialized in waste tire / plastic / rubber pyrolysis machine, oil distillation machine and tire shredder machine.The main products of equipments producing are :fuel oil,crude oil,carbon black powder ,steel wire and gas.Which is widely used in hotel,restaurant,bath center and power plant etc.
SPECIFICATIONS FOR WASTE TYRE/PLASTIC/RUBBER PYROLYSIS MACHINE
Item | Detail | |||
Type | JZ-05 | JZ-08 | JZ-10 | JZ-12 |
Raw material | Waste tyre ,plastic | |||
Capacity/day | 5t | 8t | 10t | 12t |
Inlet diameter | 1200mm | |||
Working | Batch-tyre | |||
Covering area | 150 | 160 | 180 | 200 |
Oil yield | 45%~50% | |||
Labor force | 2-3 | |||
Reactor size | D2200*L5000mm | D2200mm*L5000mm | D2200mm*L5000mm | D2200mm*L5000mm |
Noise | ≤85dB | |||
Tyre of cooling | Water-cooling | |||
Weight | 24t | 28t | 31t | 33t |
Running time | 16-18h | |||
Fuel | Charcoal,wood,oil,and gas | |||
Carbon discharge | Slagging automatially | |||
Remark | It can be customized according to customer’s actual needs |
working process:
Feeding systerm: (1)if the tyre is small,put it into the reactor directly;
(2)if the tyre is big or the material is plastic,cut the big tyre into small part
(3)the length of the belt is 8 to 10meters and the width is 0.8meter,which can stretch into the reactor abundantly,
(4)what's more,the belt conveyor is auto feeding ,need less labor force,only one person to operate it.
|
Heating systerm:
(1)the fuel you using for the reactor includes coal ,wood,natural gas or diesel,
(2)when the temperature arrives to 100,water steam can be eliminated by the blowoff valve on the gas separator,
(3)when the temperature goes to 200,high purified oil gas comes into being.
|
Purification systerm: (1)gas separetor can make oil gas and impurities separeted, remove the dust and slag,speed up the pyrolysis process.
(2)As your request , a hommization design for the oil gas separator, we shall equip a negative pressure device.
(3)After gas separator ,the oil gas flows into the depositing tank ,in which the oil can be devided into light oil and heavy oil ,the heavy oil can floe into heavy oil tank, while the light oil will flow into the cooling systerm.
|
Cooling systerm: (1)there are 16 pipes in the cooling pool as a type for a larger cooling area . which shall be 66 square meters,each pipe is 6 meter without two elbows, the thickness of the pipe is 2~2.5mm with a total length of 96 meters.
(2)After 15 pipe’s cooling, light oil flows into the light oil tank, but still remains some combustible gas can’t be cooled down to oil. It shall be re-deposited through the 16th pipe.
(3)The final gas will burn the reactor as the recycling fuel through water seal.
|
Dedusting systerm: (1)the smoke generated between the furnace and cover shall be attracted down to the pool which is full of alkaline solution at a high speed by the power of draft fan.
(2)After impact and atomization through 3 baffles, smoke and solution fully mixed, solution catches the dust for the purpose if dedusting.
(3)Neutralization happens when the acid gas is mixed with the alkaline liquid, for the purpose of sulfur removel.
(4)The rest smoke will cut into the water film cyclone, cylinder wall forms a water membrane by centrifugal force, then dust will be absorbed by the water membrane for the second dedusting.
(5)When the smoke flow into the chimney seat ,it will get a third dedusting through a water cleaning tank in the chimney seat. |
Main Parts of plant
Best after-sale service
1. We will supply the foundation drawings to buyer after get deposit.
2. We will send engineers to install the machine when the machine reach buyer's factory. The engineer will install, guide the machine, then training the workers for buyer.
3. We warranty the complete machine one year, we will maintenance all it life.When the machine can not running normal, the buyer can call us, we will help buyer repair it by call, if can not solve, we will send engineer to buyer's factory at the shortest time.if need change parts,the buyer can buy it from our factory.
Processing
(1). Delivery time- It will be 20 working days after we receive the deposit.
(2). Installation and Training-Our company will send one technician for each set of machine for guiding your installation, testing the machine and training your workers. The installation period shall be one month; over one month, you have to pay extra salary for the technician with the price of $100 per day. And the round tickets
and accommodation shall be taken by customer.