30TPD full automatic continuous plastic scrap recycling machine
USD $300,000 - $450,000 /Set
Min.Order:1 Set
Xinxiang City Jinzhen Machinery Manufacturing Co., Ltd.
continuous plastic scrap recycling machine
We mainly specialized in Continuouswaste tire / plastic / rubber pyrolysis machine, oil distillation machine and tire shredder machine.The main products of equipments producing are :fuel oil,crude oil,carbon black powder ,steel wire and gas.Which is widely used in hotel,restaurant,bath center and power plant etc.
3D photo of continous tyre pyrolysis machine:
Advantages:
1.This continous tyre pyrolysis machine is fully automatic. Using PLC system control, it can fulfill feeding while oil coming out and discharging. It can continous work 24hours*6months.
2.Automatic control heating and pressure. When the fire isn’t enough, the alarm will ring to remind worker to increase fire.
3.Big cooling area. 4 cooling systems to improve high oil rate.
4.Advanced deduster system. It’s environmental protect, zero pollution. It can reach European standard. The waste gas can be used as fuel to heat the reactor, save your cost.
5.Safety devices. Safety valves, alarm ring, thermometer, vacuum devices, these can insure the safety when running.
Parameters:
No. | Items | Specifications |
|
|
|
1 | Equipment type | JZC-30 |
|
|
|
2 | Raw material | Tyre, Plastic, Rubber |
|
|
|
3 | Structure form | Horizontal |
|
|
|
4 | Capacity | 30 tons per day |
|
|
|
5 | Working Type | Continuous type |
|
|
|
6 | Material of reactor | Q345R boiler plate |
|
|
|
7 | Thickness of reactor | 16mm |
|
|
|
8 | Size of reactor | D1500mm×D10000mm |
|
|
|
9 | Land requirement | 500 (equipment occupied 400 ) |
10 | Power consumption | 70KW |
|
|
|
11 | Fuel | Coal, wood, gas or heavy oil |
|
|
|
12 | Workers | 2 workers |
|
|
|
13 | Output Rate | Get about 35%-75% fuel oil over 150℃, till 220℃ |
|
|
|
14 | Carbon | 25%-35% |
|
|
|
15 | Water vapor | 1-5% |
|
|
|
16 | Oil slag | 9% (can put into reactor as fuel material) |
Main Parts of plant
Best after-sale service
1. We will supply the foundation drawings to buyer after get deposit.
2. We will send engineers to install the machine when the machine reach buyer's factory. The engineer will install, guide the machine, then training the workers for buyer.
3. We warranty the complete machine one year, we will maintenance all it life.When the machine can not running normal, the buyer can call us, we will help buyer repair it by call, if can not solve, we will send engineer to buyer's factory at the shortest time.if need change parts,the buyer can buy it from our factory.
Processing
(1). Delivery time- It will be 20 working days after we receive the deposit.
(2). Installation and Training-Our company will send one technician for each set of machine for guiding your installation, testing the machine and training your workers. The installation period shall be one month; over one month, you have to pay extra salary for the technician with the price of $100 per day. And the round tickets