Carton Shrink Wrap Machine
USD $8,000 - $10,000 /Piece
Min.Order:1 Piece
Zhangjiagang Mars Packing Machinery Co., Ltd.
Carton Shrink Wrap Machine
FEATURES:
1.sealing and protect the operato meanwhile.
2.Double size fan carrying system ensur the perfect of sealing.
3.Imported AC contractor, the temperature be controlled by automatic.
4.Imported frequency converter, stepless speed regulating.
5.Super cooling system to ensure the perfect shape of products quickly ofter shrinking.
6.The control panel be operated with safe and simple.
7.The imputing position can be adjustable precision base on the size of products.
8.The size of tunnel can be customized for your requset.
9.Up and down large power fan system to assure the excellent effect of shrinking in onetime.
ST6040+BSE6040A is suitable for wrapping of such prkducts as pop-top, mineral water, bottles beer, drinks etc without bottom-tyay(or with bottom-tray). Working with PE shrink tunnel to pack the goods perfectly. The whole producing process adopt the Germany aduanced technics. And the main parts are imported from international famous companies, such as OMRON, MITSUBISHI, FUJI ets, capability stable and using long-time.
Model | ST6040 | BSE6040A |
Max. packing dimension | L450×W560×H360mm | W550×H450mm |
Min. packing dimension | 250×60×60mm | W100×H50mm |
Power supply | 220-240V/50-60Hz | 3P 220V,380-460V/50-60Hz |
Power | 700W | 22KW |
Packing speed | 2-5pcs/minute | 0-15m/minute |
Sealing time/Tunnel time | 0.5-1.5s | 0-0.6s |
Conveyor loading | 30kgs | 30kgs |
Width of the film/Thickness | Max. 550mm | 0.04-0.12mm |
Machine size | L1150×W910×H1860mm | 2750×840×1600mm |
Machine weight | 200kg | 340kg |
Shrink film | PE, PP | PE, POF, PVC, PP |
Product show
1.MARS company can provideo one stop service including whole factory design,product solution design,abroad installation, worker training,spare parts supply etc.
2. MARS company have professional design team, our engineer can draw bottle samples and flow chart of
workshop for you .
3. MARS company give you the best quotation for all kinds of beverage production, only you can tell me which
kind of drink you want to product, what is your capacity(how many bottles one hour) what is you bottle
material, pet or glass,etc
After service:
1. We send the engineers to help installing, commissioning and training, the engineers start from our factory area.
2. We supply below necessary documents with the machine:
a. Machine layout
b. Electricity diagram
c. Machine certificate
d. General operation manual/maintenance book
3. After two year guarantee, the seller provides payable spare parts and technician’s VISITING maintenance
service.