Factory price Cross cooling tower fill for tower / cooling tower fill
USD $0.6 - $2.1 /Piece
Min.Order:1000 Pieces
Hebei Long Zhuo Trade Co., Ltd.
1. New PVC material , good elastic charactor
2.stable performace
3. Thickness available: 250 mircon to 500 micron
Factory price Cross cooling tower fill for tower / cooling tower fill
Cooling towers reject heat from water-cooling systems to the atmosphere. Hot water from the system enters the cooling tower and is distributed over the fill (heat transfer surface). Air is induced or forced through the fill, causing a small portion of the water to evaporate. This evaporation removes heat from the remaining water, which is collected in the cold water basin and returned to the system to absorb more heat. Each cooling tower line, although operating under the same basic principle of operation, is arranged a little differently.
Cooling tower fill is one of the most important components for exchange of gas and water in cooling tower. The heat and resistance characteristic of the cooling tower fill are the main factors influencing the cooling efficiency. Moreover the quality of the material will influence the fill's lifetime. Our company choose the high quality fill for the cooling tower. Marley cooling tower fill is with the advantages of good chemical stability, resistant acid, alkali and organic solvent corrosion, high cooling efficiency, small ventilation resistance, strong hydrophilicity, large contact area etc
Liangchi Cooling Tower Fill Product Details
Name: | PVC fill for Liangchi cooling tower |
Type: | Cooling Tower Parts |
Unit: | PC |
Material: | PVC |
Usage: | For industrial cooling tower |
Temperature suitable | 60 degree C-35 degreeC |
Color | Carbon black, grey, etc |
Shaping mode | Plastic extrusion mould |
Brand Name: | Long Zhuo |
Place of rigin: | Hebei,China |
Minimum Order: | 100 0PCS |
Packaging Details: | In bundle, film+wooden pallet or as your requests. |
Terms of payment: | T/T |
Supply Ability: | 100000 pieces/month |
Production date: | Within 15 days |
Liangchi Cooling Tower Fill Technical Data
Cooling tower fill is available in MX75configuration and higher-performing MX625 configuration. MX is a hanging film type cooling tower fill which spreads the water into a thin film, flowing over large vertical surfaces, promoting maximum exposure to air flow. This type of fill provides much more water surface exposure per cubic foot than splash type fill.
MX fill incorporates highly efficient cellular drift eliminators, integrally molded within the fill sheets. Compared with previous designs, these eliminators reduce drift emissions from the tower by a factor of ten or more! Less drift means tower owners save water bills and water treatment chemical expenses.
This fill virtually eliminates the nuisance caused by drift spotting on adjacent buildings and property. For additional savings, the drift eliminators discharge air directly toward the fan. Discharge air, traveling in the right direction when it leaves the eliminators, translates to lower fan horsepower.
Louvers are also integrally molded within the fill sheets preventing water from escaping and assuring precise air distribution throughout wide variations in airflow. Unlike towers equipped with separate external louvers, this fill operates virtually ice-free even in extremely cold weather.
MX fill is thermoformed from PVC with a flame spread rating less than 25 per ASTME-84 and is considered selfextinguishing. Therefore, the risk of fire damage is minimal.
Cooling tower fills Features and Benefits
• Engineered “herringbone” surface (left) for even water distribution
• Honeycomb bonded edges on the air inlets and outlets
• Interlocking offsets space the sheets and form a pack that is strong enough to be stacked one on top of the other in towers with fill heights over 10 ft (3050 mm). In these applications, Brentwood recommends the use of AccuGrid panels at the interface.
• Bottom-supported for durability and ease of installation
we can according to customers' special needs
CUSTOMER BENEFITS
Our workshop
Other products of our company
Why choose Long Zhuo ?
1. Highest quality
We are the manufacture who adopts import raw materials. It is amazing, and with cheap price and guaranteed
quality.
2. Most competitive price.
We can adjustment the price according to your market demand’s changes,and also can launch a series of promotional activities in a bad economic environment
3. Professional
We are special in producing and sells, as development, methods, and handling.
4. Best service
Answering emails or solving questions timely. Delivery and update information on time. Trust, good quality and service are the basic of long term business.