Package Bottle Hot Air Circulating Dryer
USD $1,380 - $2,380 /Set
Min.Order:1 Set
Zhangjiagang Jiazhou Machinery Co., Ltd.
1. Introduction:
This machine can be use to drying bottles before its labeling. this dryer is for wind knife dryer, the air through the filter, into the low temperature fan, the air compressor, through the pipe into the wind knife, the knife in the wind formed with strong wind, the wind of the bottle of water, the walls of the water film, different direction from compulsory blow dry. Suitable for high speed production line in use, such as: beer production line, high speed in liquor, health wine production line.
2. Features:
1) The dry machine adopts the advanced wind blade technology, stable performance, low temperature operation, high visibility, blow
In the drying effect is good, suitable for high speed production line to use.
2) The machine air knife can be adjusted in the up and down or so in each direction, according to the need to adjust the dry area, also
Tuyere size can be adjusted according to the production, easy to operate.
Bottle type.
3) The machine USES broad, glabrous to brush the dust pollution, maintenance free, glass can be light
To water, it has better effect to use ceramic bottle.
4) Low energy consumption, is now the most ideal dry wine packaging line tool.
5) No wearing parts.
3. Technical parameter:
Model | CGJ-1 |
Conveyor width | 100mm |
Bottle neck dia. | 50-100mm |
Bottle height | 150-350mm |
Power | 5.5KW |
Voltage | 380V/50Hz |
Weight | 120kg |
Size | 2000*720*1400mm |
Material | 304 or 316 stainless steel |
Our service:
1.Jiazhou company can provide turn-key project for you, only you have any idea to start beverage factory plant.
2.Jiazhou company have professional design team, our engineer can draw bottle samples and flow chart of
workshop for you .
3.Jiazhou company give you the best quotation for all kinds of beverage production, only you can tell me anna which kind of drink you want to product, what is your capacity(how many bottles one hour) what is you bottle material, pet or glass,etc
Aftersale service:
1. We send the engineers to help installing, commissioning and training, the engineers start from our factory area.
2. We supply below necessary documents with the machine:
a. Machine layout
b. Electricity diagram
c. Machine certificate
d. General manual book/maintenance book
3. After one year guarantee, the seller provides payable spare parts and technician’s VISITING maintenance service.