LMS telescopic drawer slider roll forming machine
USD $100,000 - $140,000 /Set
Min.Order:1 Set
Guangzhou LMS Machinery Co., Ltd.
LMS telescopic drawer slider roll forming machine(35 #)
(1) Material:Carbon steel
(2) Thickness:1.2mm
(3) Parameters:10’’,12’’,14’’,16’’,18’’,20’’,22’’,24’’(8 parameter in all)
(4) Production line components:roll forming machine,assembly machine(middle rail+ ball case& middle rail+ outer rail),bead pressing machine,outer rail oiling machine,punch machine,rivet punching machine,manual press machine,oil pump,moulds.
Roll forming machine
(1) Working process:
decoiling→feeding→roll forming→straightening→hydraulic cutting→run-out table
(2) Components: manual decoiler, feeding guide device, roll forming device, straightening device, shearing device, transmission device, cooling device, electric control, pneumatic control
a. Manual decoiler
Inner diameter for coil:450mm-530mm
Max. outer diameter for coil:1200mm
Loading capacity:1T
b. Feeding guide device
Vertical guide roller: GCr15,chrome plating & Quenching and tempering treatment
Guide screw:45# steel,chrome plating
Manual hand wheel,guide screw & movable slider adjustment for different material width
c. Roll forming machine
Roller qty: 12 groups
Roller material: Cr12Mov
Roller treatment: Quenching and tempering (HRC58- 60)
Main shaft: Φ45mm
Main shaft material: 40Cr, quenching and tempering treatment
Min. outer diameters: Φ110mm
Machine frame: Steel welding
Speed control: frequency invertors
d. Straightening device
5 rollers,Up-2 & lower-3 structure,
3 lower rollers are driven by speed reducer
Quenching and tempering treatment (HRC58- 60)
Main shaft material: 40Cr, quenching and tempering treatment
e. Shearing device
Hydraulic station:1 set
Hole punching& shearing mould:1 set
Punch pressure:45T
Hydraulic equipment:Taiwan
Mould frame seal height: 240 mm
Max. cylinder stroke 100 mm
Mould frame guiding linear track guide, on Bottom
Mould frame return by buffering cylinder driven
Profile length tolerance 0.2mm(Length ≤ 800 mm)
f. Transmission device
Power transition by belt, gears driven
Main side-wall thickness: 53 mm
Minor side-wall thickness: 33 mm
Driven system among Rollers by Gears
Gear Qty: 5
Positive cone Bearings: 30208(2 Sets) (shaft diameter tolerance within 0.04 m)
Negative Cone Bearings: 6208(1 set)
Main Motor: 5Kw
Forming Speed: 5 - 8 m / min
g. Cooling system
Cooling pipe set on roller to cool off heat during forming
Cooling driven by Motor on water pump
Coolant: emulsified oil
h. Electronic Control System
Auto controller frequency invertor, PLC, etc.
PLC: Taida, Taiwanese
Relay: IDEC, Japanese
Profile shearing process: stop-shear
Operational controller: knob switch, emergence button, etc.
Main machine power supplier: 380V, 50Hz, 3P
Pneumatic components AIRTAC, Taiwanese
Air consumption 10 L/ Min., 0.4 - 0.6 Mpa
PAYMENTTERMS
By T/T, 40% as deposit and 60% balance before shipment.
DELIVERYDAYS
100DAYS
INSTALLATION, MAINTENANCE AND OPERATOR TRAINING
(1) Guaranteed against malfunction due to manufacturing defects for 12 months from the date of loading. In that situation, repairs will be made free of charge.
(2) Repairs will not be performed free of charge even during the guarantee period in the following circumstances:
a. Damage occurs due to a natural disaster.
b. Malfunction occurs due to user error.
c. Malfunction occurs due to modifications.
d. Malfunction occurs due to further movement or shipment after installation.
2. Seller is responsible for installation and adjustment and buyer covers installation cost as
Followed byT/T or cash before or on engineers’ visit.
(1) Round trip air tickets fee
(2) Accommodation fee
(3) The seller technician salary for installation machine: USD 100.00 / person / day