LMS Ball Bearing Drawer Slides Roll Forming Line
USD $100,000 - $140,000 /Set
Min.Order:1 Set
Guangzhou LMS Machinery Co., Ltd.
LMS Ball Bearing Drawer Slides Roll Forming Line
(1) Material:Carbon steel
(2) Thickness:1.2mm
(3) Parameters:10’’,12’’,14’’,16’’,18’’,20’’,22’’,24’’(8 parameter in all)
(4) Production line components:roll forming machine,assembly machine(middle rail+ ball case& middle rail+ outer rail),bead pressing machine,outer rail oiling machine,punch machine,rivet punching machine,manual press machine,oil pump,moulds.
1. Roll forming machine
1. Roll forming machine
(1) Working process:
decoiling→feeding→roll forming→straightening→hydraulic cutting→run-out table
2. Rivet machine 1 set
(1) Power Press: 16Tons
(2) Riveting mould: 1Set (Separated from production line)
3. Bead case production line
(1) Decoiler
(2) 3C pneumatic feeder
(3) 40MT power press, 40-60Strokes/min.
(4) Mould: 1Set (4 bead carrier/stroke)
4. Auto assembling machine
5. Outer rail oiling machine
6. Bead press machine
7. Manual press machine
PAYMENTTERMS
By T/T, 40% as deposit and 60% balance before shipment.
DELIVERYDAYS
100DAYS
INSTALLATION, MAINTENANCE AND OPERATOR TRAINING
(1) Guaranteed against malfunction due to manufacturing defects for 12 months from the date of loading. In that situation, repairs will be made free of charge.
(2) Repairs will not be performed free of charge even during the guarantee period in the following circumstances:
a. Damage occurs due to a natural disaster.
b. Malfunction occurs due to user error.
c. Malfunction occurs due to modifications.
d. Malfunction occurs due to further movement or shipment after installation.
2. Seller is responsible for installation and adjustment and buyer covers installation cost as
Followed byT/T or cash before or on engineers’ visit.
(1) Round trip air tickets fee
(2) Accommodation fee
(3) The seller technician salary for installation machine: USD 100.00 / person / day