LMS Ball Bearing Drawer Slides Roll Forming Line
LMS Ball Bearing Drawer Slides Roll Forming Line
LMS Ball Bearing Drawer Slides Roll Forming Line
LMS Ball Bearing Drawer Slides Roll Forming Line

LMS Ball Bearing Drawer Slides Roll Forming Line

USD $100,000 - $140,000 /Set

Min.Order:1 Set

Supply Ability:
100 Set / Sets per Month
Port:
Guangzhou China

Quick Details View All >

Brand Name:
LMS
Model Number:
45# production line
Condition:
New
After-sales Service Provided:
Engineers available to service machinery overseas

Guangzhou LMS Machinery Co., Ltd.

Business Type: Manufacturer,Trading Company
Guangzhou Guangdong China
Main Products: Machinery and Equipment Roll Forming Machine ,Slitting Machine ,Cut to Length Machine ,Duct Machine ,Pipe Machine ,Drawing Machine

Product Details

                                                                                           

 LMS Ball Bearing Drawer Slides Roll Forming Line

 

 

(1) Material:Carbon steel

(2) Thickness:1.2mm

(3) Parameters:10’,12’,14’,16’,18’,20’,22’,24’(8 parameter in all)

(4) Production line components:roll forming machine,assembly machine(middle rail+ ball case& middle rail+ outer rail),bead pressing machine,outer rail oiling machine,punch machine,rivet punching machine,manual press machine,oil pump,moulds.

1. Roll forming machine

LMS Ball Bearing Drawer Slides Roll Forming Line

 

1. Roll forming machine

 

 

 

(1) Working process:

 

decoilingfeedingroll formingstraighteninghydraulic cuttingrun-out table

 

 

2. Rivet machine 1 set

 

 

 

LMS Ball Bearing Drawer Slides Roll Forming Line

(1) Power Press: 16Tons

 

(2) Riveting mould: 1Set (Separated from production line)

 

 

 

3. Bead case production line

 

 

(1) Decoiler

 

(2) 3C pneumatic feeder

 

(3) 40MT power press, 40-60Strokes/min.

 

(4) Mould: 1Set (4 bead carrier/stroke)

 

 

4. Auto assembling machine

LMS Ball Bearing Drawer Slides Roll Forming Line  

 

 

 

5. Outer rail oiling machine

LMS Ball Bearing Drawer Slides Roll Forming Line

 

 

 

6. Bead press machine

LMS Ball Bearing Drawer Slides Roll Forming Line

 

 

 

7. Manual press machine

 

LMS Ball Bearing Drawer Slides Roll Forming Line

 

 

 

PAYMENTTERMS

 

By T/T, 40% as deposit and 60% balance before shipment.

 

DELIVERYDAYS

 

100DAYS

 

INSTALLATION, MAINTENANCE AND OPERATOR TRAINING

 

(1) Guaranteed against malfunction due to manufacturing defects for 12 months from the date of loading. In that situation, repairs will be made free of charge.

 

(2) Repairs will not be performed free of charge even during the guarantee period in the following circumstances:

 

a. Damage occurs due to a natural disaster.

 

b. Malfunction occurs due to user error.

 

c. Malfunction occurs due to modifications.

 

d. Malfunction occurs due to further movement or shipment after installation.

 

2. Seller is responsible for installation and adjustment and buyer covers installation cost as

 

Followed byT/T or cash before or on engineers’ visit.

 

(1) Round trip air tickets fee

 

(2) Accommodation fee

 

(3) The seller technician salary for installation machine: USD 100.00 / person / day

 

 

Contact Supplier

Mr. Yongdong Zhu Manager Chat Now
Telephone
86-20-87319590
Mobile
13822280343
Fax
86-20-87319225
Address
14ABC, West Tower, Dongxing Building, 488 Huanshi East Road, Guangzhou Province. China Guangdong

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Machinery > Other Machinery & Industry Equipment
Categories
Hi~