Acetylene Plants, Acetylene Gas Plant, Acetylene Generators, Acetylene Plants Producers
Acetylene Plants, Acetylene Gas Plant, Acetylene Generators, Acetylene Plants Producers
Acetylene Plants, Acetylene Gas Plant, Acetylene Generators, Acetylene Plants Producers

Acetylene Plants, Acetylene Gas Plant, Acetylene Generators, Acetylene Plants Producers

Negotiable /Set

Min.Order:1 Set

Supply Ability:
0 per Month
Port:
New Delhi

Quick Details View All >

Place of Origin:
Delhi, India
Brand Name:
DCPL
Model Number:
DCPL 15 to 200 m3/hr
Usage:
oxy-acetylene gas welding
Certification:
ISO 9001:2008 Certified
After-sales Service Provided:
Engineers available to service machinery overseas

DELHI CRYOGENIC PRODUCTS PRIVATE LIMITED

Business Type: Manufacturer
Haryana India
Main Products: OXYGEN PLANT ,OXYGEN GAS PLANT ,LIQUID OXYGEN PLANT ,OXYGEN NITROGEN PLANTS ,LIQUID OXYGEN/NITROGEN PLANTS

Product Details

 

Acetylene Gas Plant/Machine

DCPL acetylene gas plants are based on the most modern and versatile design. The acetylene generator plants and acetylene plants is made to the highest quality standards in the world. All the fabricated vessels are welded as per the standard norms. All weld joints are subject to dp test at every layer, 100% radiography and then finally subjected to hydraulic test. All the components are engineered to the proper design and drawings. DCPL Acetylene Generator Plant of twin hopper generator is fully automatic and mainly consists of the following:

DCPL Acetylene Plants are available in 25m3/hr, 50m3/hr & 100 m /hr capacities and uses all types of carbide quality but best for 4-25 mm
Acetylene Plants, Acetylene Gas Plant, Acetylene Generators, Acetylene Plants Producers
Technical Specification

Specification
For 25 Cum/Hr Acetylene Plant
For 50 Cum/hr Acetylene Plant
For 100 cum/hr Acetylene Plant
Capacity
For 25 Cum/hr
50 cu.m/Hr
100/Hr
Cylinders filled per batch
30
60 cylinders
120 cylinders
Carbide size
4-25mm
4-25 mm (or higher)
4-25mm (or Higher)
Hopper Capacity
100 Kg
150 kg
300 kg
Carbide required per batch
600 kg approx.(depending on carbide quality)
1,200 kg approx.(depending on carbide quality)
2700 kg approx. (depending on carbide quality)
Water required
10 liters per kg of Calcium Carbide used
10 liters per kg of Calcium Carbide used
10 liters per kg of Calcium Carbide used
Power required
12kw
18 KW
30 KW
Start up time
15 minutes
15 minutes
15 minutes
II S/BS. Specifications conforms to
- Acetylene Generator"
- Flame-proof motors
IS 8471-1977 IS 2148 (Group II-B)-1968 As amended
IS 8471-1977 IS 2148 (Group II-B)-1968 As amended
IS 8471-1977 IS 8471-1977 IS 2148 (Group IIB-1968 as amended)
Space Requirement
1. Process Area
70 Sq.M.
110 Sq.M
150 Sq.M
2. Carbide Storage Area
75 Sq.M.
112 Sq.M
175 Sq.M.
3. Cylinders filling Area
40 Sq.M.
60 Sq.M
100 Sq.M.
4. Cylinders storage area (depending upon cylinders inventory)
100 Sq.M.
160 Sq.M
200 Sq.M.
5. Lime slurry disposal area
100 Sq.M.
180 Sq.M
250 Sq.M.
6. Free space around the plant (on all sides)
16 M
18.5 M
20 M
7. Acetone godown
12 Sq.M.
20 Sq.M
30 Sq.M.



Contact Supplier

Mr. Kunal Kumar Sales & Marketin Chat Now
Telephone
91-124-4386250
Mobile
9810626301
Fax
91
Address
A- 104, Okhla Industrial Area, Phase- 2 Delhi

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Machinery > Machine Tool Equipment > Welding Equipment > Other Welding Equipment
Categories
Hi~