AAC block 50000 m3 aac block in building blocks -Air roll-over craft
USD $258,630 - $285,963 /Set
Min.Order:1 Set
Henan Teng Fei Machine Manufacturing Co., Ltd.
AAC block 50000 m3 aac block in building blocks -Air roll-over craft
Name | Index | Remarks |
Capacity m³/year | 50,000-150,000 | Annual capacity |
Size of blank(m) | 4.2*1.2*0.6 | Net |
Cutting moulds No.(mm) | 5/10 | Vertical Cutting/Horizontal Cutting |
Cutting precision(mm) | ±3±1.5±1.5 | Length/Width/Height |
Production cycle(Min/Mould) | 5 | —— |
Quality of host cutting machine(T) | 12 | Vertical Cutting/Horizontal Cutting |
Power(KW) | 11.4 | Including hydraulic station |
5. Features of 50,000m3/year aac block in building blocks
6. Parameters of 50,000m3/year aac block in building blocks
1). Main Technical Data
Name | Index | Remarks |
Capacity m³/year | 50,000-150,000 | Annual capacity |
Size of blank(m) | 4.2*1.2*0.6 | Net |
Cutting moulds No.(mm) | 5/10 | Vertical Cutting/Horizontal Cutting |
Cutting precision(mm) | ±3±1.5±1.5 | Length/Width/Height |
Production cycle(Min/Mould) | 5 | —— |
Quality of host cutting machine(T) | 12 | Vertical Cutting/Horizontal Cutting |
Power(KW) | 11.4 | Including hydraulic station
|
2). Cement lime fly ash style aerated block raw material proportion
Name | unit | Cement lime fly ash |
Flyash | % | 65-70 |
Cement | % | 6-15 |
Lime | % | 18-25 |
Gypsum | % | 3-5 |
Aluminum powder paste(600kg/m3) | 1/10000 | 8 |
Water & material rate |
| 0.60-0.65 |
Casting system | OC | 36-40 |
Aluminum mixing time | S | 30-40 |
3). Cement lime fly ash style aerated block raw material proportion
Name | Unit | Cement Lime Sand |
Sand | % | 55-65 |
Cement | % | 10-20 |
Lime | % | 20-30 |
Gypsum | % | 2-3 |
Aluminum powder paste(600kg/m3) | 1/10000 | 8 |
Water & material rate |
| 0.65-0.75 |
Casting system | OC | 35-38 |
Aluminum mixing time | S | 30-40
|
And more about us and construction machinery
1.Pre-sale service: our company can provide technological guidance and formulate suitable equipment matching program according with your specific production requirements.
2.On-purchase service: our company can solve professional technical problems and other related issues for you.
3.After-sales service: our company provides that engineers available to service machinery overseas and equipment for life maintenance.
1.Delivery time: 15 days after receipt of your deposit.
2.Payment terms: 30% T/T in advance, the balance is paid (by T/T) before delivery.
3.Package:
1).Wire cables are used for fastening the machine on the trailer or inside the container.
2).Cork wood are placed in front or behind the machine to protect it.
3).Plastic film is covered on the machine as a rain-roof.
4).Crane is used during the whole loading.