50000m3 aac plant / aac block plant -Ground turn over craft
USD $105,896 - $286,806 /Set
Min.Order:1 Set
Henan Teng Fei Machine Manufacturing Co., Ltd.
50000m3 aac plant / aac block plant -Ground turn over craft
6. Flow chart of 50,000m3/year aac block machine
7. Main Technical Data of 50,000m3/year aac block machine
1). Main Technical Data
Name | Index | Remarks |
Capacity m³/year | 50,000-150,000 | Annual capacity |
Size of blank(m) | 4.2*1.2*0.6 | Net |
Cutting moulds No.(mm) | 5/10 | Vertical Cutting/Horizontal Cutting |
Cutting precision(mm) | ±3±1.5±1.5 | Length/Width/Height |
Production cycle(Min/Mould) | 5 | —— |
Quality of host cutting machine(T) | 12 | Vertical Cutting/Horizontal Cutting |
Power(KW) | 11.4 | Including hydraulic station
|
2). Cement lime fly ash style aerated block raw material proportion
Name | unit | Cement lime fly ash |
Flyash | % | 65-70 |
Cement | % | 6-15 |
Lime | % | 18-25 |
Gypsum | % | 3-5 |
Aluminum powder paste(600kg/m3) | 1/10000 | 8 |
Water & material rate |
| 0.60-0.65 |
Casting system | OC | 36-40 |
Aluminum mixing time | S | 30-40 |
3. Cement lime fly ash style aerated block raw material proportion
Name | Unit | Cement Lime Sand |
Sand | % | 55-65 |
Cement | % | 10-20 |
Lime | % | 20-30 |
Gypsum | % | 2-3 |
Aluminum powder paste(600kg/m3) | 1/10000 | 8 |
Water & material rate |
| 0.65-0.75 |
Casting system | OC | 35-38 |
Aluminum mixing time | S | 30-40
|
And more about us and construction machinery
Henan Teng Fei Machine Manufacturing Co., Ltd. is a collection of scientific research, development, production marketing for the integration of manufacturing enterprise; The company execute principles “development is a competition philosophy” and take “efficient, pragmatic, cooperation, innovation “as beliefs.
Teng Fei Group is a manufacturer of construction machine and mine machine, with more than 15 years experience, mainly produce concrete batching plant, AAC block line, stabilized soil mixing plant, dry mortar production line, cement production line, concrete mixer, concrete pump ,concrete truck, cement silo, crusher, ball mill, raymond mill, sand making line and so on.
1.Delivery time: 15 days after receipt of your deposit.
2.Payment terms: 30% T/T in advance, the left is paid (by T/T) before delivery.
3.Package:
1).Wire cables are used for fastening the machine on the trailer or inside the container.
2).Cork wood are placed in front or behind the machine to protect it.
3).Plastic film is covered on the machine as a rain-roof.
4).Crane is used during the whole loading.
1.pre-sale service: our company can provide technological guidance and formulate suitable equipment matching program according with your specific production requirements.
2.on-purchase service: our company can solve professional technical problems and other related issues for you.
3.after-sales service: our company provides that engineers available to service machinery overseas and equipment for life maintenance.