High quality Rotary Dryer for sale with CE certificate
USD $2,000 - $5,000 /Set
Min.Order:1 Set
Application
1.This rotary dryer is mainly used to dry powder, pellets, sawdust and other small materials. Different material will have different capacity, but the capacity can not influence the drying quality;
2.Reasonable structure, high efficiency, low consumption, convenient operation, low maintenance cost;
3.This dryer also can be changed according to the nature of the different materials, so that the material inside the dryer drum can form a stable full cut curtain fabric, quality heat exchange is more fully.
Working principle
1.Material to be dried enters the dryer, and as the dryer rotates, the material is lifted up by a series of internal fins lining the inner wall of the dryer.
2.When the material gets high enough to roll back off the fins, it falls back down to the bottom of the dryer, passing through the hot gas stream as it falls.
3.Then water will be separated from the materials by hot air-flow and changed into vapor to be discharged into the atmosphere.
4.Then the materials would be dried.
Main data
Model | Capacity (t/h) | Power (kw) | Mosituer | Moisuter | Calorific value of coal (Kcal/Kg) | Temperature |
Φ1.5x14 | 4-6 | 15 | 60±5 | ≤8 | ≥6000 | 800±30 |
Φ1.8x18 | 6-10 | 18.5 | 60±5 | ≤8 | ≥6000 | 800±30 |
Φ2.0x20 | 8-12 | 18.5 | 60±5 | ≤8 | ≥6000 | 800±30 |
Φ2.2x20 | 10-15 | 22 | 60±5 | ≤8 | ≥6000 | 800±30 |
Φ2.4x20 | 15-20 | 22 | 60±5 | ≤8 | ≥6000 | 800±30 |
Machine details
All our package are standard fumigated wooden box, we need around 5 working days to finish the machine and ready to deliver. If want extra spare parts pls notify when place order.
Quality guarantee terms:
Quality guarantee is one year. Spare parts we supply at factory cost lifetime.
We will be responsible for any broken which are caused by machine-self and quality problem, other situations which are caused by wrong operation, man-made problems etc will be in buyer’s response, and we will help to solve by video asap, if big problem we will send engineer to working site within 1 week.