Small investment, High Recovery Lead ore Blast Furnace
USD $0.1 - $100,000 /Set
Min.Order:1 Set
Unionsum International Industrial Co., Ltd.
Lead concentrate, Lead smelter, Battery recycling plant, Blast Furnace
mini furnace 300tpm battery recycling plant, rotary furnace for lead
Rolled Pb/Ca (0.07) /Sn (1.35%) anode for high purity Copper, Ni, Co, production plant
Rolled lead/calcium (0.07) / tin (1.35%) anode of Copper, Nickle smelter, metallurgical plant
Rolled lead/calcium (0.07) / tin (1.35%) anode for copper electrowinning
Small investment, High Recovery Lead ore Blast Furnace
Blast furnace, as traditional Lead smelting furnace, can be applied to process materials with high moisture content (8% max) and well-adaptable to different feed materials such as oxide ore, carbonate ore, and so on. The raw material feed in will be pre-heated by waste heat with high heat efficiency. Yet since the smoke can’t be discharged orderly, it cause environmental problems. Thus we make the following improvements on the traditional blast furnace.
Nowadays, the furnace has become the best choice for the medium and small scale raw ore smelters and large scale spent Lead-acid battery recycling plants.
Blast furnace can be used for:
The whole system includes blast furnace, blast blower, disc ingot casting machine, water quenching tank, and off-gas treatment system.
1. Blast Furnace Specification
Blast furnace | One unit |
furnace body | rectangle shape, encircled with steel water jacket outside, steam jacket at the tuyere |
Feeding column height | -- |
space height above feeding column | -- |
Bed height | -- |
Hearth depth | -- |
Hearth thickness | -- |
Tuyere diameter | -- |
Center distance of tuyeres | -- |
Number of tuyeres | -- |
Inclination angle of tuyere | - |
Tuyere ratio | - |
Bush cone | -- |
2. Blast blower specification
Blast blower | one unit, Roots blower |
Air pressure | 20kPa |
Air volume | |
Air intensity |
Table 4-5 Disc ingot casting machine specification
Mould amount | 16 |
Each mould volume | 0.2 m3 |
Casting sequence | pouring and casting, cooling and demoulding |
3. Water quenching tank
Water quenching tank | Three stage sedimentation, partitions in the tank, upper clear liquid back to |
Length | |
Width | |
Depth | |
Water quenching slag removal | Regularly removal by excavator |
4. Composition of off-gas
Composition | SO2 | CO2 | N2 | O2 | H2O | Inlet temperature |
(Volume%) | 1.01 | 8.93 | 76.2 | 12.01 | 1.85 | 200~250℃ |
5. off-gas treatment specification
Bag-house dust collector | One unit |
Off-gas amount | |
Air leakage rate | ≤10% |
Dust collect efficiency | 99.92% |
Pressure drop | 1500Pa |
Velocity of filtering | 0.7m/min |
We suggest blast furnace for fire-refining due to its
a) High heat efficiency: furnace burden heated by the waste heat of the off-gas.
b) High recovery rate: The molten lead and slag will be separated completely in blast furnace hearth, because the blast furnace hearth has higher temperature an d more obvious slag line than rotary furnace to sedimentate the lead metal from slag. recovery rate can reach ≥98, with ≤2% Pb content in slag
c) Large capacity in the same operation area: 35 t/(m2·d).
d) Low energy consumption: No other fuel required except coal.
1. Technical process
No. | Item | Unit | Index | Remarks |
1 | workdays per year | d | 300 |
|
2 | feeding |
| Lead paste |
|
3 | consumption of coke | % | <12 | to feeding |
4 | dust rate | % | 8~12 | to feeding |
5 | S content in clean off-gas | mg/m3 | <800 |
|
6 | daily crude lead capacity | t | 60 |
|
7 | Pb content in slag | % | <2 |
|
8 | Pb recovery rate | % | >98 |
|
Prospecting Mining Metallurgy Processing Trading EPC service
Unionsum, a subsidiary of CRIMM, provides sustainable system solution for mining and
metallurgy industry, including engineering, procurement and construction, and offers a widerange of
scientific research and consultingservices.
Mining and Metallurgy Experts
History from 1953
Most authoritative and comprehensive organization in China mining and metallurgy industry
2 academicians of China Engineering Academy, 108 professors and 500 senior engineers
50 Laboratories and Pilot Plants (2 state key Labs)
Decades experiences in research and engineering service
Qualifications
Clients Visiting
Global Market
Vacuum distillation project at Bulgaria Rotary Furnace at Thailand
Contact information
Skype: claire.zhou
M.P: 86-18890384660
Web: http://unionsum.en.china.cn
Add: F3, Yubang Internation Plaza, No.222, Xinyao Road (S),
Tianxin District,Changsha, Hunan, China