food-grade flexitank packing for oil
USD $176 - $327 /Set
Min.Order:10 Sets
Qingdao LET Flexitank Co., Ltd.
Qingdao LET Flexitank Co.,Ltd is a professional manufacturer of Flexitanks.
Flexitank Advantages
1, Low costs--saving storage, freight, cleaning and labor cost;
2, High loading--contain 24,000 liters liquid at most, 35%more than drums or bottles;
3, Convenient--Easy to operate and transport;
4, Environment friendly---food-grade and degradable.
Flexitank Specifications
WE LET FLexitank has 5 layers, 1 outer layer with High strength PP material, 4 inner layer with PE material,
3 inch Valve, and other accessories include: cardboard, bulkhead and steel bars.
Product Name | Main material | Material description | Picture |
Flexitank 14KL ¦ 24KL | PE | 4 inner layers food grade PE film (125mic) |
|
PP | 1 outer layer Strong PP woven fabric (225g per square meter) | ||
Valve | Top loading &Top discharge(TB), Bottom load & Bottom discharge(BB), Top load & Bottom discharge(TB) | ||
3-inch Butterfly valve/Ball valve | |||
Accessories | Steel bar--2450*277*65mm 5PCS/set; Bulkhead--2330*1680*20mm 1PC/set; Corrugated paper--1400*300mm(diameter) 1roll/set Foam strip | ||
Special component | Heating pad--avoid solidifying and keep flowing Air vent--Release air | ||
Paper IBC | liners | Single valve/Double valve |
|
Octagon carton | Compared with singe octagon carton,we combine inner octagon with outside square, it has better compression resistance and stability without using pallet. |
| |
Pallet | Hard paper pallet(5 tons load-bearing)/wooden pallet |
|
Flexitanks pics for your reference
Flexibag with and without liquid
Flexitank Installation Procedure
Installation procedure | Pictures |
1, Choose a better container, check strictly and clean the inner flints. | |
2, Lay the corrugated paper in three sides and the bottom of the container to avoid bareness. | |
3, Take out of the flexitank and paper pipes from the packaging box. | |
4, Fix the steel bar using the paper pipes. | |
5, Install and tie the bulkhead& steel bar together with a fixed rope. | |
6, Pave the flexitank and secure it by suspending the four corners while opening the valve cap. | |
7, Fix the valve cap properly. | |
8, Close the left door and make sure the foam strip doesn’t exceed. | |
9, Connect the valve with the pipe and set them, open the valve to charge the liquid. | |
10, When the loading is finished, close the valve first and then disconnect the pipe and screw the valve cap on. |