Pulverized Coal Burner Specialized For PTT Company In Taihland
USD $3,000 - $30,000 /Set
Min.Order:1 Set
Zhengzhou Dayu Machinery Co., Ltd.
Pulverized Coal Burner Specialized For PTT Company In Taihland
On Nov 8, 2013. 3 Thailand customers from the PTT company with their Chinese friend came to visit our factory. PTT company is the biggest company in Thailand, PTT is one of the top 500 company in the world, and the 3 customers all serve with a key position in the PTT. They are mainly to study our coal powder burner. As satisfied with our coal burner, they will buy 3 RM1500 coal burner at first to test our quality and service, and then they want to be our exclusive agency in Thailand. In order to show their sincerity, they sign the MOU with us already,
on Nov9, they visited our LB3000(capacity 240t/h) asphalt batch mix plant with our coal burner worksite. They satisfied with our asphalt plant and coal burner very much, and warmly welcome our engineer to visit their worksit in Thailand on Nov 18 and make a solve project for their worksite.
Zhengzhou Dayu Machinery Co., Ltd is a professional construction machinery for Asphalt Plant and Pulverized Coal Burner over 20 years.
Dayu Asphalt Plant Spare Parts have mainly four groups:
1, Pulverized Coal Burner Specialized For PTT Company In Taihland
2, Drying Drum of the asphalt plant spare parts
3, Baghouse dust collector of the asphalt plant spare parts
4, Diesel oil burner of the asphalt plant spare parts
Pulverized Coal Burner Specialized For PTT Company In Taihland
Used for 25-320 t/h asphalt mixing plant
RM series rotation type coal burner features:
1. Adopt new design structure, which changed the principle of traditional burner, adopt rotation type combustor to solve the imperfections of traditional burner(easy slagging, incomplete combustion);
2. High flame temperature, energy saving, burning sufficient;
3. Adopt high performance refractory brick, prolong service life;
4. 24 hours continuous production, no need do slag removal work everyday;
Production cost is low, the cost is only about 1/5 of the oil burner
Pulverized Coal Burner Requirements of fuel
1. Use 0 # diesel for oil burning igniter
2. Requirements for the quality of coal using for burning:
1) Mark of coal: bituminous coal
2) Calorific value: ≥25kJ
- gross calorific value 7000 kcal/kg
- net calorific value 5000 kcal/kg
3) Yield of volatile matter: ≥25%
4) Permissible ash 8~10%
5) Total moisture 3~4%
6) Total sulphur ≤1%
7) Particle size: ≤20mm
Note: These indexes are the lowest requirements for the coal, the better coal will be better at practice.
3. Environment friendly:
Combustion completeness ≥95%,
Air black: Ringelmann 0-I grade, no harm to environment
FMJ series Pulverized Coal Burner
used for producing and supplying coal powder for coal burner.
Powder particle size: R90<20% (0.09mm)
General parameters of Pulverized Coal Burner
Model | RM500 | RM1000 | RM1500 | RM2000 | RM3000 | RM4000 |
Power | 31.25 kw | 41.25 kw | 73.75 kw | 97.25 kw | 138.45 kw | 202.95 kw |
Rated coal consumption | 450 kg/h | 1000 kg/h | 1500 kg/h | 2000 kg/h | 2860 kg/h | 3660 kg/h |
Mixture temperature control | 130-180°C | 130-180°C | 130-180°C | 130-180°C | 130-180°C | 130-180°C |
Main machine | LTZ40 | LTZ80 | LTZ120 | LTZ160 | LTZ240 | LTZ320 |
Coal crusher | FMJ40 | FMJ80 | FMJ120 | FMJ120+ FMJ40 | 2*FMJ120 | 3*FMJ120 |
Oil burning igniter | RYDH | RYDH | RYDH | RYDH | RYDH | RYDH |
Distribution cabinet | PD40 | PD80 | PD120 | PD160 | PD240 | PD320 |
Combustion completeness | ≥95% | ≥95% | ≥95% | ≥95% | ≥95% | ≥95% |
Matching asphalt plant output | 25-40 t/h | 70-85 t/h | 100-125 t/h | 140-170 t/h | 200-250 t/h | 280-320 t/h |
Worksite photos of our Coal burner
Warranty Period : 18 months after install the plant.
More information can be get by contact with Zhengzhou Dayu Machinery Co.,Ltd