Pulverized Coal Burner for Asphalt Mixing Plant
USD $30,000 - $100,000 /Set
Min.Order:1 Set
Zhengzhou Dayu Machinery Co., Ltd.
Introduction:
RM pulverized coal burner with a specially designed multi-stage air-driven structure to speak out of turn, can produce in a short time so that high-temperature pulverized coal swirl with burning completely, heat utilization high, smoke dust, efficient energy saving, improvement of working conditions, reducing labor intensity, etc.,RM pulverized coal burners are ideal for energy saving and environmental protection products.
Features------ Pulverized Coal Burner for Asphalt Mixing Plant :
1. Adopt new design structure,;
2. High flame temperature, energy saving, burning sufficient;
3. Adopt high performance refractory brick, prolong service life;
4. 24 hours continuous production, no need do slag removal work everyday;
5. Production cost is low, the cost is only about 1/5 of the oil burner .
Requirements of fuel
1. Use 0 # diesel for oil burning igniter
2. Requirements for the quality of coal using for burning:
1) Mark of coal: bituminous coal
2) Calorific value: ≥25kJ
- gross calorific value 7000 kcal/kg
- net calorific value 5000 kcal/kg
3) Yield of volatile matter: ≥25%
4) Permissible ash 8~10%
5) Total moisture 3~4%
6) Total sulphur ≤1%
7) Particle size: ≤20mm
Note: These indexes are the lowest requirements for the coal, the better coal will be better at practice.
3. Environment friendly:
Combustion completeness ≥95%,
Air black: Ringelmann 0-I grade, no harm to environment
FMJ series coal crusher
used for producing and supplying coal powder for coal burner.
Powder particle size: R90<20% (0.09mm)
General parameters------ Pulverized Coal Burner for Asphalt Mixing Plant :
Model | RM500 | RM1000 | RM1500 | RM2000 | RM3000 | RM4000 |
Power | 31.25 kw | 41.25 kw | 73.75 kw | 97.25 kw | 138.45 kw | 202.95 kw |
Rated coal consumption | 450 kg/h | 1000 kg/h | 1500 kg/h | 2000 kg/h | 2860 kg/h | 3660 kg/h |
Mixture temperature control | 130-180°C | 130-180°C | 130-180°C | 130-180°C | 130-180°C | 130-180°C |
Main machine | LTZ40 | LTZ80 | LTZ120 | LTZ160 | LTZ240 | LTZ320 |
Coal crusher | FMJ40 | FMJ80 | FMJ120 | FMJ120+ FMJ40 | 2*FMJ120 | 3*FMJ120 |
Oil burning igniter | RYDH | RYDH | RYDH | RYDH | RYDH | RYDH |
Distribution cabinet | PD40 | PD80 | PD120 | PD160 | PD240 | PD320 |
Combustion completeness | ≥95% | ≥95% | ≥95% | ≥95% | ≥95% | ≥95% |
Matching asphalt plant output | 25-40 t/h | 70-85 t/h | 100-125 t/h | 140-170 t/h | 200-250 t/h | 280-320 t/h |
Pictures----- Pulverized Coal Burner for Asphalt Mixing Plant :