80t/h Construction Machinery!! Asphalt Mixing Plant, Asphalt Batching Plant, Asphalt Plant Price LB1000
USD $199,893 - $210,659 /Set
Min.Order:1 Set
Zhengzhou Double Birds Machinery Co., Ltd.
80t/h Construction Machinery!! Asphalt Mixing Plant, Asphalt Batching Plant, Asphalt Plant Price LB1000
Capacity and Mian Technical Data of LB1000 Asphalt Plant
Rated production | 80t/h | |
Cold aggregate container | 4 containers×9m³ | |
Dry cylinder | 1.5m×6m | |
Bag dust-remover | CNM357 | |
Emission standard | 50mg/Nm³ | |
Vibrating screen | 4 layers | |
Hot aggregate container | 26t | |
Mixing kettle capacity | 1000kg | |
Mixing cycle | 45s | |
Mineral powder tank volume | 26+36t | |
Asphalt tank volume | 50000L | |
Heat conduction oil stove | 300,000 kcol/h | |
End-product container volume | 90t | |
Control system | Manual /semi-auto / automatic | |
Weighing accuracy | Aggregate | ≤±0.4% |
| Powder material | ≤±0.3% |
| Asphalt | ≤±0.2% |
Installed general power | 230kw |
Cold Aggregate
Aggregate Metering System
Directly-heated Asphalt Tank
Dust Remover System
Vibrating Screen System
Drying Drum
SIEMENS Controller Control System
Bitumen Metering System
1. All the equipments should be packed into the 40HQ containers,
2. Some parts should be packed by the wood box for safety,
3. During the transportation period ,all components must be fixed by the iron wire of the steel frame,
4.The production period :30-35days, installation period :15-20days,
1. Warranty time 13 months, product was tested and functions properly before leaving our factory, we provide a high standard of quality control and manufacturing.
2.Turn-Key Solutions from inquiry to customers' project starting.
3. Erection & Commissioning Service was supplied in time for customers' differernt requirements.
4. Operation Training Service for our customers by site guiding operation or videos expressage.
5. Spare Parts Supplied for all working life, wearing parts are free supplied in time by expressage.