construction equipment used asphalt plant for sale
USD $199,893 - $210,659 /Set
Min.Order:1 Set
Zhengzhou Double Birds Machinery Co., Ltd.
construction equipment used asphalt plant for sale
Capacity and Mian Technical Data of LB1000 Asphalt Plant
Rated production | 80t/h | |
Cold aggregate container | 4 containers×9m³ | |
Dry cylinder | 1.5m×6m | |
Bag dust-remover | CNM357 | |
Emission standard | 50mg/Nm³ | |
Vibrating screen | 4 layers | |
Hot aggregate container | 26t | |
Mixing kettle capacity | 1000kg | |
Mixing cycle | 45s | |
Mineral powder tank volume | 26+36t | |
Asphalt tank volume | 50000L | |
Heat conduction oil stove | 300,000 kcol/h | |
End-product container volume | 90t | |
Control system | Manual /semi-auto / automatic | |
Weighing accuracy | Aggregate | ≤±0.4% |
| Powder material | ≤±0.3% |
| Asphalt | ≤±0.2% |
Installed general power | 230kw |
Cold Aggregate Hopper
Made of overall steel welding structure, it can store and provide aggregate of various specifications.
Dust Remover System
Dust Remover System, two stage dust remover(primary snailed dust remover and secondary dry type bag dust remover)
Vibrating Screen System
4-6 layers, large screen area, high efficiency, anti-resonance and thoroughly screen,
Drying Drum
Drying drum is one core part of asphalt mixing plant, it use to dry and heat aggregate, so that the moisture is under 5%
Control System
The control system adopts the SIEMENS integrated solution which plays a leading role in the industrial automation field. It also uses the PROFIBUS field bus to form a large and medium-sized distributed automatic system.
1. All the equipments should be packed into the 40HQ containers,
2. Some parts should be packed by the wood box for safety,
3. During the transportation period ,all components must be fixed by the iron wire of the steel frame,
4.The production period :30-35days, installation period :15-20days,
1. Warranty time 13 months, product was tested and functions properly before leaving our factory, we provide a high standard of quality control and manufacturing.
2.Turn-Key Solutions from inquiry to customers' project starting.
3. Erection & Commissioning Service was supplied in time for customers' differernt requirements.
4. Operation Training Service for our customers by site guiding operation or videos expressage.
5. Spare Parts Supplied for all working life, wearing parts are free supplied in time by expressage.