100t/h Asphalt Plant Price , Asphalt Batching Plant, Asphalt Plant LB1200
USD $219,600 - $219,600 /Set
Min.Order:1 Set
Zhengzhou Double Birds Machinery Co., Ltd.
100t/h Asphalt Plant Price , Asphalt Batching Plant, Asphalt Plant LB1200
1. Capacity and Mian Technical Data of L1200 Asphalt Plant
Item | Parameter | Remark |
Capacity | 100t/h | Rated condition |
|
|
|
Cold aggregate bin | 4 units |
|
Feeding hopper oversize screen | Four sets, mesh 100mmx100mm |
|
Dry drum | Diameter: 1600mm×7800mm, capacity: 110t/h | Chain drive, with insulating layer outside, with stainless steel |
Burner | Diesel/heavy oil | Coal burner is optional |
Dust collection system | Primary filter+Bag house dust collection | Water dust collection is optional |
Mineral powder supply system | 30m³ mineral powder hopper(PHE is optional) | Tank top dust catcher |
2, 30-72 Tons Storage Cold Aggregate Supply System with 2.2kw or 3kw Belt Feeder Drive Equipment
Bin volume and number is customizable, separated structure design significantly reduces dimensions for shipping and ensures a high capacity.
Two independent cold feeders and modular design, transport expediently.
Seamless ring belt, high reliability and long life.
Frequency convertor controlled SIEMENS motor, infinite variable speed adjustment, more accurate and energy saving.
3, Aggregate Metering System with 3 Weight Sensors 2 Clamshell Discharge Gates
The high efficiency of the aggragate weighting hopper is incomparable, Operated by the cylinder, the two discharge gates start synchronously with very fast discharge speed, to shorten the cycle and reduce the abrasion of stirring pot,
The brass bushings are used for the pivots of discharge grates to extend it sservice life,
It is easy to access to the gates through the overhaul door on both sides of the hopper, so the maintenance of pivot is simple and easy.
4. Combustion System with Oil Supply and Air Supplu Devices, Igniting Coal by Oil.
Italy EBICO burner imported with original packing ,high burning efficiency, diesel/heavy oil dual purpose or gas as fuel is optional,
With automatic flame failure protection devices for emergency,
Without ash deposition, with the high alumina refractories of high temperature, anti-spalling and high thermal shock resistence, it has long working life.
5, " Volute Casing Collector + Bag House Collector " Dust Collection System
Two level dust collection system (volute casing collector + bag house collector), with high and low temperature protection device for the system security.
Bag house collector using USA Dupont NEMEX bags, heat resisting and long life.
6, Vibrating Screen System with 4-6 layers, large Screen Area, Anti-resonance and Thoroughly Screen.
4-6 layers, large screen area, high efficiency, anti-resonance and thoroughly screen,
External control vibrating located outside heating area,
With access door for easy maintenance and replacement,
Totally bolted frame and swing are adjustable, screen is tested at the factory for 24 hours,
7, 110t/h Capacity SIEMENS motors, Hard-teeth Reduction Gear Drying Drum
Optimized lift blade design, make sure heating equably and high energy using ratio.
Outside the drying drum is covered with a 50mm heat preservation structure,
Professional designed lifting blades inside the drum, which can promote thermal efficiency.
Temperature detecting device is equipment beside the outlet of the drum
8, Directly-Heating Asphalt Tank
The asphlt is stored in whole tank, heated partly(tank in tank) to make asphalt heated quickly,
Meanwhile, the repeated heating of asphaltis avoided to further save energy and to ensure the quality of asphalt heating,
Preheating asphalt all high temperature in relatively closed state, greatly decresses the operating procedures, shortens the heating time, saves energy and reduces the production cost of high-temperature asphalt,
9, SIEMENS PLC Electrical Control System with Fault Self-diagnosis Process
Automatic/manual control system, with fault self-diagnosis process, operate easily and safely.
SIEMENS PLC electrical control system, reliability is high.
Fully graphic Multilanguage control interface is easy and convenient for different operators.
10, Over-large Liquid Bitumen Metering Tank Asphalt Metering System
When liquid bitumen is quickly pumped into the bitumen metering tank, the senor with three point suspension will provide accurate signal for weight display, when the bitumen in metering tank reaches the desired weight, the bitumen in pipeline will return to the bitumen tank through a reliable electric three-way value,
1. All the equipments should be packed into the 40HQ containers,
2. Some parts should be packed by the wood box for safety,
3. During the transportation period ,all components must be fixed by the iron wire of the steel frame,
4.The production period :50 days, installation period :15-20days,
1. Warranty time 13 months, product was tested and functions properly before leaving our factory, we provide a high standard of quality control and manufacturing.
2.Turn-Key Solutions from inquiry to customers' project starting.
3. Erection & Commissioning Service was supplied in time for customers' differernt requirements.
4. Operation Training Service for our customers by site guiding operation or videos expressage.
5. Spare Parts Supplied for all working life, wearing parts are free supplied in time by expressage.