PVD titanium coating plant/ion coating machine
USD $30,000 - $150,000 /Set
Min.Order:1 Set
Hongfeng Mechanical Equipment Manufactory
PVD titanium coating plant/ion coating machine
You may interested in the PVD coating machine for the following applications(direct link): | Running Videos(links to the videos) (Please copy the link to the browser address bar for video watching.) | |
Aluminum or silver mirror making | /v_show/id_XODM0NzY3NDky.html | /v_show/id_XODM0Njk1OTM2.html |
ITO conductive glass | /v_show/id_XNjg2NTIwNzQ4.html | /v_show/id_XNjg1MTk0NDI4.html |
Low-E glass coating | ||
Solar Tubes coating | ||
Plastic metallizing | /v_show/id_XNzE1MDY3NzIw.html | /v_show/id_XNDY2OTQ0MDky.html |
Headlamp metallzing | ||
Christmas Balls metallizing | ||
Shoe Heel metallizing | /v_show/id_XNzE1MDQyMzQw.html | |
Food grade coatings for plastic cutleries | /v_show/id_XNDI2NDU5MDQw.html | /v_show/id_XNDI1ODkzODI0.html |
Tools or hardwares coating | /v_show/id_XNjA3NzA5MTcy.html | /v_show/id_XNDA0MzYwNzky.html |
Stainless steel sheets with TiN coatings | /v_show/id_XMTkxMjY2MjUy.html | |
Jewelry | ||
Ceramic tiles coating | ||
Mosaic coating | /v_show/id_XNDA0Mjg5MTU2.html |
Question 1: I am going to set up a new factory. I don't know anything about the machine. Will you provide the technical support?
Answer: Sure. Every machine will be test before delivery. We will make sure there is no problem for the machine.
You may send 2-3 smart workers to come to our factory to learn how to operate the machine.
When the machine arrives your factory, we will send the experts to your factory to help for installation. Operation training will be provide. It may take about 20-30 days. Maintenance tips will be given.
Also, we provide consulting service for creating the proper facilities for running the machine.
Question 2: What is price of the machine?
Answer:
The machine is custom made. If you have any drawing or any information on specification of the machine, please send to us for quote.
If you are totally new in this area, please tell us the max. dimension of your products, its application, and your desired daily capacity.
We will provide our professional suggestions and work out an appropriate design for your project.
Question 3: What kind of pre-treatment I need to do before the vacuum PVD process?
Answer: In vacuum area, the products(we call it"substrate") have to be CLEAN, DRY AND SMOOTH. So we will need washer and dryer, sometimes base varnish, and topcoat to protect the coatings.
Question 4: Do I have to pay the costs for pollution?
Answer: The machine is environment-friendly, there is no liquid chemical waste and harmful gas. This is a kind of green technology.
Dear Customer: :-)
Good day.
When you are going to send us a inquiry, in order to design the most appropriate machine for your project, please answer the following questions in your letter:
1. What is your product, its material and application
2. What is the possible max. dimension of your product
3. What is your desired productivity per 8 hours/shift.
The answers to the above question will help us a lot on designing or do the recommendation.
Please send the inquiry at the bottom of this page.
******************************************************************************************************
Everything you need to prepare for running the PVD coating machine ESPECIALLY FOR FOR NEW USERS (Please check the specifcations of the involved machines with us) | |||
Sort of machines | Vacuum Metallising Machine | Magnetron Sputtering Machine | Arc Deposition Machine |
General needs | Cooling Water for the diffusion pump (Least): Chiller | Cooling Water for the diffusion pump, sputtering cathodes (More):Chiller | Cooling Water for the diffusion pump, arc cathodes, the vacuum chamber (Most):Chiller |
Compressor for the mecahnical pump | Compressor for the mecahnical pump | Compressor for the mecahnical pump | |
Electricity Power (Ranges 50-120kW) | Electricity Power (Ranges 50-1500kW) | Electricity Power (Ranges 50-400kW) | |
Footprint | Please check with us for different designs | Please check with us for different designs | Please check with us for different designs |
Materials for the process (Material) | Aluminum filament Tungsten filament | Target material: Titanium, Stainless steel, Chrome, Silver, Copper, Aluminum, ITO, etc | Target material: Titanium, TiAl, AlTi, Chrome, etc |
Materials for the process (Gas) | - | Agron Oxygen, Acetylene, Nitrogen, etc (All the tanks for the gases need pressure reducing valves and gas pipes, connectors) | Agron Oxygen, Acetylene, Nitrogen, etc (All the tanks for the gases need pressure reducing valves and gas pipes, connectors) |
Operators | 1-2 | 1-6(can be batch type & continuous type) | 1-2 |
Oils | Diffusion pump oil & mechanical pump oil | Diffusion pump oil & mechanical pump oil | Diffusion pump oil & mechanical pump oil |
Pretreament machines for the substrates | a. Base varnish & topcoat painting&equipment(UV painting) b. Cleaning & dry | a. Base varnish & topcoat painting&equipment(UV painting) b. Cleaning & dry | a. Ultrasonic Washing Machine b. Polishing Machine(if necessary) c. Oven d. Pure water machine |
Other items | Mentioned in the spare parts list | Mentioned in the spare parts list | Mentioned in the spare parts list |