PVD Sputtering Deposition Tool Machine
USD $60,000 - $150,000 /Set
Min.Order:1 Set
Hongfeng Mechanical Equipment Manufactory
PVD Sputtering Deposition Tool Machine
-------------------------------------------------------------------------------------------------------------------------------------------
Set up of arc deposition system:
Door
Chamber
High vacuum pumping system
Vacuum measuring and control
Fixtures moving system(Custom made)
Sputtering cathodes device
Control unit of the system
Double Stainless steel liner set
Bias power source
Iron frame
-------------------------------------------------------------------------------------------------------------------------------------------
This is a new arc ion plating system specially designed for tool coating. The vacuum chamber is a vertical barrel with a front door.
Vacuum Chamber:
Chamber cover can be disassemble and has a workpiece jig on it. There is a front door on chamber for loading and unloading of workpieces. There is one observation port on the door.
The chamber body and front door are whole water jacket structured and made of stainless steel.
There is a square-shaped flange hole for connection with vacuum system. On barrel bottom,
there are several flanges: one for installation of heater, two for gas supply and one for thermocouple.
Inside the barrel, there is a stainless neck bush to keep chamber clean. It is easily disassemble and convenient for regular clean.
The chamber is placed on a rectangle chassis which has gas supply system, side water cooling system, cables of system control and power supply. The chassis is made of carbon steel and painted with anti-corrosive paint.
Vacuum Degassing System
Vacuum system consists of following devices to meet requirement of pump down.
Rotary vane vacuum pump
Oil diffusion pump(ODP)
Roots pump
Besides pumps, the system also has valves, connecting popes,cryotrapping and instruments for measurement. Instruments for measurement is a thermocouple and ionization combined pressure gauge with pressure range 10-3 Pa to 10-4 Pa. It can switch from thermocouple gauge to ionization gauge automatically.
Gas supply system
Two or three kinds of gases can be inlet into the system for plating. Each inlet has necessary stop valve and control flow controller. Flow range is 0 to 500sccm for each inlet.
Heating System
The system has a tube-shaped heater and connected power
Temperature measurement
Temperature measurement is by thermocouple thermosistor placed inside vacuum chamber. It can detect environment temperature of chamber. For detecting surface temperature of workpiece, customer can choose infrared thermosistor.
Control System
There are two control systems for customer's choice: semi-automatic control or automatic control.
-------------------------------------------------------------------------------------------------------------------------------------------
Titanium Nitride (TiN)
Coating | Titanium Nitride |
Color | Gold |
Structure | Multi-layered |
Microhardness | 2200HV 0.05 |
Applications | A general-purpose coating allowing higher speeds and longer tool life. Effective in a wide area of metal cutting operations |
Titanium Carbonitride (TiCN)
Coating | Titanium Carbonitride |
Color | Violet-Brown |
Structure | Multi-layered |
Microhardness | 3000HV 0.05 |
Applications | A harder, more lubricious coating offering better performance in steels over HRc 40 and aluminum alloys. |
Aluminum Titanium Nitride (AlTiN)
Coating | Aluminum Titanium Nitride |
Color | Dark Gray-Black |
Structure | Graded |
Microhardness | 3300HV 0.05 |
Applications | The most abrasion resistant and hardest coating. Recommended for the machining of cast iron, hardened die steels up to HRc 60 and other heat resistant alloys. |
Titanium DiBoride (TiB2)
Coating | Titanium DiBoride |
Color | Light Gray |
Structure | Graded |
Microhardness | 4000 HV |
Applications | Our toughest coating ever, recommended |
Question 1: I am going to set up a new factory. I don't know anything about the machine. Will you provide the technical support?
Answer: Sure. Every machine will be test before delivery. We will make sure there is no problem for the machine.
You may send 2-3 smart workers to come to our factory to learn how to operate the machine.
When the machine arrives your factory, we will send the experts to your factory to help for installation. Operation training will be provide. It may take about 20-30 days. Maintenance tips will be given.
Also, we provide consulting service for creating the proper facilities for running the machine.
Question 2: What is price of the machine?
Answer:
The machine is custom made. If you have any drawing or any information on specification of the machine, please send to us for quote.
If you are totally new in this area, please tell us the max. dimension of your products, its application, and your desired daily capacity.
We will provide our professional suggestions and work out an appropriate design for your project.
Question 3: What kind of pre-treatment I need to do before the vacuum PVD process?
Answer: In vacuum area, the products(we call it"substrate") have to be CLEAN, DRY AND SMOOTH. So we will need washer and dryer, sometimes base varnish, and topcoat to protect the coatings.
Question 4: Do I have to pay the costs for pollution?
Answer: The machine is environment-friendly, there is no liquid chemical waste and harmful gas. This is a kind of green technology.
Dear Customer: :-)
Good day.
When you are going to send us a inquiry, in order to design the most appropriate machine for your project, please answer the following questions in your letter:
1. What is your product, its material and application
2. What is the possible max. dimension of your product
3. What is your desired productivity per 8 hours/shift.
The answers to the above question will help us a lot on designing or do the recommendation.
Please send the inquiry at the bottom of this page.
*******************************************************************************************************************************
Everything you need to prepare for running the PVD coating machine ESPECIALLY FOR FOR NEW USERS (Please check the specifcations of the involved machines with us) | |||
Sort of machines | Vacuum Metallising Machine | Magnetron Sputtering Machine | Arc Deposition Machine |
General needs | Cooling Water for the diffusion pump (Least): Chiller | Cooling Water for the diffusion pump, sputtering cathodes (More):Chiller | Cooling Water for the diffusion pump, arc cathodes, the vacuum chamber (Most):Chiller |
Compressor for the mecahnical pump | Compressor for the mecahnical pump | Compressor for the mecahnical pump | |
Electricity Power (Ranges 50-120kW) | Electricity Power (Ranges 50-1500kW) | Electricity Power (Ranges 50-400kW) | |
Footprint | Please check with us for different designs | Please check with us for different designs | Please check with us for different designs |
Materials for the process (Material) | Aluminum filament Tungsten filament | Target material: Titanium, Stainless steel, Chrome, Silver, Copper, Aluminum, ITO, etc | Target material: Titanium, TiAl, AlTi, Chrome, etc |
Materials for the process (Gas) | - | Agron Oxygen, Acetylene, Nitrogen, etc (All the tanks for the gases need pressure reducing valves and gas pipes, connectors) | Agron Oxygen, Acetylene, Nitrogen, etc (All the tanks for the gases need pressure reducing valves and gas pipes, connectors) |
Operators | 1-2 | 1-6(can be batch type & continuous type) | 1-2 |
Oils | Diffusion pump oil & mechanical pump oil | Diffusion pump oil & mechanical pump oil | Diffusion pump oil & mechanical pump oil |
Pretreament machines for the substrates | a. Base varnish & topcoat painting&equipment(UV painting) b. Cleaning & dry | a. Base varnish & topcoat painting&equipment(UV painting) b. Cleaning & dry | a. Ultrasonic Washing Machine b. Polishing Machine(if necessary) c. Oven d. Pure water machine |
Other items | Mentioned in the spare parts list | Mentioned in the spare parts list | Mentioned in the spare parts list |