W1209 DC 12V -50 to +110 Temperature Control Switch

W1209 DC 12V -50 to +110 Temperature Control Switch

USD $0.1 - $2 /Piece

Min.Order:1 Piece

Supply Ability:
500000 Set / Sets per Month
Port:
FOB NINGBO/SHANGHAI/HK
Payment Terms:
T/T L/C D/P D/A Credit Card PayPal

Quick Details View All >

D/C:
W1209
Package:
W1209, standard package (plastic bag+carton box)
Model Number:
W1209
Type:
Drive IC
Brand Name:
SINCO
Place of Origin:
Zhejiang, China

Cixi Sinco Machinery Factory

Business Type: Manufacturer
Zhejiang China
Main Products: metal processing ,Special-shaped pieces of processing ,plastic working ,electron component ,Auto Parts

Product Details

Product Description

W1209 DC 12V -50 to +110 Temperature Control Switch 

Specifications:

 

Temperature range :-50-110 ℃
Dimensions: 48.5 * 40mm
Temperature control mode: ON / OFF
Resolution:When temperature is 0.1℃, the resolution is -9.9~99.9, other temperature segment is 1℃
Control accuracy: 0.1 ℃
Hysteresis accuracy: 0.1℃
Refresh rate: 0.5S
High temperature protection: 0-110℃
Supply voltage: DC 12V
Static current: ≤ 35MA, attract current ≤ 65MA
Output voltage: DC 12V
Output power: 20A relay?
Measurement input: NTC (10K 0.5%) Waterproof Sensor
Environmental requirements: -10 ~ 60 ℃ ,Humidity 20% -85%

W1209 DC 12V -50 to +110 Temperature Control Switch

 

How to order? Anny could offer a custom worksheet as an order list for you. You can fill out the information about the products which you want. It is convenient for you to order the products . I believe it must be more efficient for each other ! The worksheet as following.
Packaging & Shipping

W1209 DC 12V -50 to +110 Temperature Control Switch 

Shipping & Payment

W1209 DC 12V -50 to +110 Temperature Control Switch

  • TNT: about 5-7 working days could reach your side normally
  • EMS: need 10-15 working days to reach your side
  • UPS: special express for North America,need 3-5 working days
  • DHL: normally 3-5 working days could reach your side
  • FEDEX: normally 3-10 working days could reach US and European
 
Company Information

W1209 DC 12V -50 to +110 Temperature Control SwitchW1209 DC 12V -50 to +110 Temperature Control SwitchW1209 DC 12V -50 to +110 Temperature Control SwitchW1209 DC 12V -50 to +110 Temperature Control Switch

Cixi sinco machinery factory is a professional engaged in non-standard custom lathe parts, fasteners, products processing, plastic non-standard parts processing customized enterprise, the company was founded in 1995. In 20 years the company has been uphold: quality first, service first, focus on the concept of professional. After 20 years development, it is the most professional fastener products in zhejiang processing customization enterprise.

  •   Company name:   Cixi Sinco Machinery Factory
  •   Company address: No. 202-206, Dafa Rd., Hushan, Cixi, Ningbo, Zhejiang, China (Mainland)
  •   Telephone: 0086-574-63023977
 
Certifications

W1209 DC 12V -50 to +110 Temperature Control Switch 

 

Our Services
  • As a comprehensive enterprise with an integration of R&D, design,    production, we have highly effcient  production line, advanced quality testing instruments, excellentproducts and packing
  • Our company has passed the international quality system authentication of ISO9001.
  • We enjoy a good reputation and sell productions to dozens of countries.
  • We insist that quality and honesty come first.
  • Anny will be very happy to answer your questions in 24 hours.
 
FAQ

Q1:How to guarantee the Quality of Industrial Parts?

 

A1: We have the integrated system for industrial parts quality control. We have IQC (incoming quality control), IPQCS (in process quality control section), FQC (final quality control) and OQC (out-going quality control) to control each process of industrial parts prodution.

 

 

Q2:What's the Advantage of Your Parts for Industry Products?

 

A2:The advantage of our products is the competitive prices, fast delivery and high quality. Our employees are responsible-oriented, friendly-oriented,and dilient-oriented. Our products are featured by strict tolerance, smooth finish and long service time 

 

 

Q3:what are our machining equipmengts?

A3:Our machining equipments include CNC milling machines, CNC turning machines, stamping machines,hobbing machines, automatic lathe machines, tapping machines, grinding machines, screw machines, cutting machines and so on.

 

 

Q4:How Long is the Delivery for Your Industrial Part? 

A4:Generally speaking, it will take us 15 working days for machining parts and 25   working days for stamping parts products. But we will shorten our lead time as soon as possible according to customers' demands.


Contact Supplier

Mr. GAO YE manager Chat Now
Telephone
0086-0574-18058276507
Mobile
13968256507
Fax
0086-0574-63023977
Address
188-200 Dafa Road, Gutang St. Zhejiang

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Electronic Components & Supplies > Active Components > Integrated Circuits
Categories
Hi~