High quality low price ore chute feeder
USD $1,000 - $5,000 /Set
Min.Order:1 Set
Shandong Zhaoxin Heavy-Duty Mining Machinery Co., Ltd.
High quality low price ore chute feeder
Features of chute feeder
1. Chute feeder is generally hung at the discharging port of ore bin.
2.Feeding is realized through reciprocation of the bottom plate of the chute, with 20-60 times / min, and stroke of 20-200mm.
3. The feeding quantity depends on the stroke. The method of adjusting the stroke: make proper adjustment through adjusting the eccentricity of eccentric wheel of drive unit.
Notes for selection
1. According to beneficiation scale and operation rules, specify the model of corresponding feeder, which shall be made by the manufacturer.
2. The motor can be changed to a speed-regulating motor, which shall require a special order.
Technical parameter of chute feeder
Model | Outlet Dimensions(W*H) | Max feed Particle size(mm) | Feed capacity(t/h) | Motor model | Motor power(kw) | Weight(kg) |
CG600*500 | 600*500 | 200 | 10-50 | Y112M-4 | 4 | 1045 |
CG700*500 | 700*500 | 250 | 10-60 | Y112M-4 | 4 | 1100 |
CG1240*980 | 1240*980 | 350 | 36-90 | Y160M-6 | 7.5 | 1710 |
Certificate and honor
Shandong Zhaoxin Heavy-duty Mining Machinery Co., Ltd. is a professional manufacturer of all kinds of mining equipment, with ISO9001-2008 certificated.
With 30 years manufacturing experience and scientific management and strong financial strength, the company has become a large and leading manufacturer in mineral processing and smelting equipment for nonferrous metals and nonmetals in Shandong area.
Among processing equipment, there includes feeding, crushing, sieving, grinding, classification, stirring, flotation, magnetic separation and cold separation. Moreover, the company offers full service from mining, prospecting, mineral processing experiment, project technical design, machinery and equipment installing to technical conduction and operators training.
Q: About payment
A:Usually 30%T/T prepaid and 70%TT to be paid upon received copy of bill of lading.
A:Commonly 10~30 days after received 30% deposit. Depends on detailed product. We will advise the detailed delivery time upon received your specific inquiry.
Q:Instalation
A: As per customer's requests, Zhaoxin would arrange installation technicians to supervise and assist in the assembly and commissioning of the equipment.
If any question about our product, please feel free to contact us.