HOT SALE high quality GBH medium apron feeder feeding equipment
USD $100 - $10,000 /Set
Min.Order:1 Set
Shandong Zhaoxin Heavy-Duty Mining Machinery Co., Ltd.
GBH medium apron equipment
Features of apron feeder equipment
Since this type of apron feeder equipment is classified into left drive and right drive, please specify it while placing an order.Center distance between two sprockets can be supplied as per the customer's requirement; speed-regulating motor also can be supplied as per the customer's requirement.
Technical parameters of apron feeder equipment
Item | Feeding capacity(t/h) | Width(mm) | Power(w) | Speed(m/s) | Feed particle(mm) | Total weight(kg) |
Model | ||||||
GBH80-2.2 | 15-91 | 800 | 7.5 | 0.025-0.15 | 300-400 | 3722 |
GBH80-4 | 15-91 | 800 | 7.5 | 0.025-0.15 | 300-400 | 4903 |
GBH100-1.6 | 22-131 | 1000 | 7.5 | 0.085-0.1693 | 300 | 3561 |
GBH100-3 | 22-131 | 1000 | 7.5 | 0.025-0.15 | 350 | 4548 |
GBH100-12 | 22-192 | 1000 | 15/10 | 0.0085-0.1693 | 350 | 19405 |
GBH120-1.8 | 35-217 | 1200 | 7.5 | 0.025-0.15 | 300-400 | 3965 |
GBH120-2.2 | 35-217 | 1200 | 7.5 | 0.025-0.15 | 300-400 | 4238 |
GBH120-2.6 | 35-217 | 1200 | 7.5 | 0.025-0.15 | 300-400 | 4572 |
GBH120-3 | 32-217 | 1200 | 7.5 | 0.025-0.15 | 300-400 | 4886 |
GBH120-4 | 14-289 | 1200 | 7.5 | 0.025-0.15 | 300-400 | 5706 |
GBH120-4.5 | 9-63 | 1200 | 11/7.5 | 0.01-0.2 | 350 | 7260 |
GBH120-6 | 9-63 | 1200 | 7.5 | 0.0058-0.04 | 400 | 8061 |
Safe shipment
Before sales: Guide customer to choose the most suitable type of equipments; provide advanced, energy-saving and practical flow chart as well as responsible for designing the whole schem.
On sales: Inspect the product seriously before out of the factory; Invite customer for commissioning in the spot and raising the objection:Organize to delivery according to the contract.
After sales: Company can send technical persons for guiding to install machine,debug and train the workers.
We will provide one-year warranty to make sure your machine work well. We have spare parts of the very machine in stock all the time which means the replacements can be sent to you timely.
Certificates
Delivery time: Within 30 days
Payment Terms: 30% T/T in advance, balance payment before shipment
Delivery port: As you required
Quotation type: FOB, CIF, CFR
If you have any problems, please feel free to contact us. We would do our best to solve them as soon as possible. Welcome to negotiate the price, you can gain the maximum efficiency with the minimum investment.