400KW motor soft start up cabinet with soft starter bypass contactor and breaker
USD $150 - $5,000 /Piece
Min.Order:1 Piece
Shenzhen EMHEATER Technology Limited
motor soft start cabinet integrated bypass contactor and breaker
motor soft start up cabinet with soft starter bypass contactor and breaker
18KW 380V online soft starter cabinet no need built-in by pass contactor
motor soft start up cabinet with breaker 3phase 380V 30KW soft starter for Heat pump
AC electric motor soft starter cabinet 5.5KW to 600KW with Built-in air breaker
EM-GJ series Soft Starter cabinet
Brief Imformation:
EM-GJ series Soft Starter is a new type start-up equipment which integrates electric force and electronic techniques, computer technique and modern control theory. It is the new generation product to replace the conventional Star-delta Starter, Self-coupling voltage-drop Starter and Magnetic control voltage-drop Starter.
Feature:
Item | Description | |
Input Power Supply | Input Voltage | Three-phase 220V/380V/480V AC |
Frequency | 50/60Hz | |
Adaptive Motor | Squirrel-cage three-phase asynchronous motor | |
Starting Times | It is recommended not to exceed 20 times per hour. | |
Control Mode | (1) Operation panel control; (2) Operation panel + external control; (3) External control; (4) External control + COM control; (5) Operation panel + external + COM control; (6) Operation panel + COM control; (7) COM control; (8) No start or stop operation. | |
Start Mode | (1) Current-limiting start; (2) Voltage ramp start; (3) Kick start + current-limiting start; (4) Kick start + voltage ramp start; (5) Current ramp start; (6) Voltage current-limiting double closed-loop start. | |
Stop Mode | (1) Soft stop; (2) Free stop. | |
Protective Function | (1)Open loop protection for external instantaneous stop terminals; (2) Over-heat protection for soft starter; (3) Protection for too long starting time; (4) Input open phase protection; (5) Output open phase protection; (6) Unbalanced three-phase protection; (7) starting over current protection; (8) Running overload protection; (9) Under voltage protection for power voltage; (10) Overvoltage protection for power voltage; (11) Protection for fault parameter setting; (12) Load short circuit protection; (13) Auto restart or incorrect wiring protection; (14)Incorrect wiring protection of external control stop terminals. | |
Ambient | Place to be used | Indoor location with good ventilation free from corrosive gas and conductive dust. |
Altitude | Below 3000M. It have to rise the rate power when the altitude is more than 3000M. | |
Temperature | -30 +55 oC | |
Humidity | 90%RH without dew condensation. | |
Vibration | <0.5G | |
Structure | Protection Class | IP20 |
Cooling Pattern | Natural wind cooling. |
Soft starter connection and main circuit connetion diagram:
Soft starter connection diagram
Main circuit connection diagram
Factory to shoot:
Application:
The loading | Voltage ramp starting time(s) | Voltage ramp stopping time(s) | Initial voltage | Voltage ramp (current limit) | Current limit to start |
Ball mill machine | 20 | 6 | 60% | 400% | 350% |
Fan | 26 | 4 | 30% | 400% | 350% |
Centrifugal | 16 | 20 | 40% | 400% | 250% |
Piston compressor | 16 | 4 | 40% | 400% | 300% |
Lift | 16 | 10 | 60% | 400% | 350% |
Stirring machine | 16 | 2 | 50% | 400% | 300% |
Breaker | 16 | 10 | 50% | 400% | 350% |
Screw compressor | 16 | 2 | 40% | 400% | 300% |
Rotating conveyor | 20 | 10 | 40% | 400% | 200% |
Light load | 16 | 2 | 30% | 400% | 300% |
Convey belt | 20 | 10 | 40% | 400% | 250% |
Heat pump | 16 | 20 | 40% | 400% | 300% |