FRP injection molding cooling tower
USD $10,000 - $50,000 /Set
Min.Order:1 Set
Hebei Shengwei Ji Ye Frp Group Co., Ltd.
frp cooling tower sprinkler head, cooling tower spray nozzle, small cooling tower
High quality small cooling tower, cooling tower water treatment chemicals, cooling water tower
FRP cooling water tower, marley cooling tower, liangchi cooling tower
marley cooling tower, liangchi cooling tower , cooling tower louvers
frp cooling tower, cooling tower float valve, High Temperature Big Cooling Tower
High Temperature Big Cooling Tower, High Quality Big Cooling Tower,Big Cooling Tower
Introduction to the cross-flow FRP cooling tower
On both sides of the series of crossflow FRP cooling tower used in the wind, on the top of the fan, make the air through the tower packing, on both sides of the medium to exchange with hot water, hot and humid air outside released back to the tower.Filler used on both sides there are salient points of wave plate, by installing head make point wave plate bonding into a whole, in order to improve the rigidity, the two sides of the convex point can also be avoided direct drop, thus improve the ability of water film formation, packing the tail has a closed water measures.
Product features:
1, save a space, light-duty structures
Using specially designed for this series of cooling tower of efficient heat transfer packing, its heat transfer area increased significantly, compared with the original HBLD series and the original HBLCD series, it covers an area of a sharp drop, due to the structural design of optimization and adopts steel structure, operating weight also greatly reduced.
2, save power
The ventilation resistance small packing and designed by tsinghua university designed for the cooling tower wing type FRP high efficiency fan, thereby reducing the motor power, low noise machine adopts the motor power of the smaller, more save power, can also according to the requirement of the user, double speed motor to power saving.
3, low running noise
Designed by tsinghua university designed for the cooling tower FRP material wing low noise axial flow fan and designed for the cooling tower and low noise motor, so as to reduce the running noise of cooling tower.Low running noise lower noise series of cooling tower, fully meet the environmental requirements.If A two-speed motor, running at low speed in the night, still can make noise again fell by 2 to 3 db (A), the user needs A two-speed motor is to be A separate request in order.
4, good corrosion resistance
Tower body, sink and panel adopt has good corrosion resistance performance of FRP materials, and add a light stabilizer to the gel coating, has a good anti-aging performance, do not change color.Steel tower structure using galvanized processing after processing, improve the corrosion resistance performance of the cooling tower, within normal service life, without additional anti-corrosion.
5, convenient combination
Combinations can be used to meet the requirements of different working conditions, users also can be decided according to the field situation, and can according to the structure characteristics of the user, to adjust the appearance of the cooling tower.Such as user space is very limited.Our factory can also be designed for the special requirements of users, to meet the requirements of the users and the performance of thermal noise.
6, maintenance is convenient
This series of cooling tower for the modular design, adjacent cooling tower air chamber separated from each other, is available in the cooling tower under the premise of normal operation, maintenance overhaul, clean packing, water pipe and water tank work more convenient.
Before-sale services:
(1) Tell customers how to use our products and matters needing attention.
(2) Guide customers to choose the best and economic product, recover the investment within short time.
(3) Site inspection if you need.
In-Sale services:
(1)Quality control must be inspected strictly.
(2)In accordance with the agreements stipulated in the contract.
After-sale services:
(1) If the project needs our installation guidance, we can send our engineer and translator. We can also send customers installation video to teach them how to fix and operate with our product.
(2) Usually, our product warranty is 18 months after leaving factory or 12 months after installation. within this months, all parts broken will be responsible for our factory.
(3) Regular contact with customer, consult with the customer feedback, come true with the customer's two-way communication.