China Suppliers High Quolity Tiny Houses with 240 USD per Sqm .
China Suppliers High Quolity Tiny Houses with 240 USD per Sqm .
China Suppliers High Quolity Tiny Houses with 240 USD per Sqm .
China Suppliers High Quolity Tiny Houses with 240 USD per Sqm .
China Suppliers High Quolity Tiny Houses with 240 USD per Sqm .
China Suppliers High Quolity Tiny Houses with 240 USD per Sqm .

China Suppliers High Quolity Tiny Houses with 240 USD per Sqm .

USD $220 - $220 /Square Meter

Min.Order:40 Square Meters

Supply Ability:
30 Set / Sets per Month
Port:
Guangzhou
Payment Terms:
T/T L/C D/P D/A Credit Card PayPal

Quick Details View All >

Place of Origin:
Guangdong, China
Brand Name:
Moneybox
Model Number:
PV020

Guangzhou Moneybox Steel Structure Engineering Co., Ltd.

Business Type: Manufacturer
Guangzhou Guangdong China
Main Products: Container House ,light steel villa ,Prefab house ,sandwich panel prefab house ,garden shed

Product Details

Product Description

Prefabricated villa house.

1)  prefabricated house is popular for the prefab labor camp, for the labor dormitory, canteen, office and security room.
2) Simple and strong building, 6 people one team, one day can install more than 350 m2.
3)  prefabricated house is recyclable, it can be assemble and disassemble six times.
4) Modern good looking, all the steel structures are hidden inside.
5) prefabricated house has a good water proof and noise proof solution performance.
6) Square tube is the main steel structure, make the prefab house very strong and easy install, one floor, two floor and three floors for your choosing.

Detailed Images
Packing & Delivery
FAQ

1.Q: Could you please design a new and unique prefab house for me?
A: Absolutely! We are able to provide you with not only construction scheme and structural drawings, but landscape design! Besides, detailed drawings and 3D models are surely included. One-stop service is our outstanding superiority with no doubt.

2.Q: What should I provide to build a light steel prefab house?
A: So easy! Sketch drawing would be a better reference for us. However, you will never mind if you don’t have any. Simply notify us your requirements, such as the area, usage and the storeys of the house. Before long, you’ll possess an amazing design.

3.Q: How could I ensure the cost of building a light steel prefab house?
A: Firstly, the designing scheme should be accepted. Then, the kinds of building materials should be confirmed since different types and qualities make various prices. After that, we will send you a detailed quotation.

4.Q: How Long does it take to build a prefab house?
A: It depends on the size of the house. Generally, the construction period of is 1 month of a 200-square-meter house by a construction team of 5-6 people. It only costs one week to build the steel structure frame.

5.Q: Is it difficult to build a prefab house?
A: totally not, you can build the house independently according to the construction drawings as long as you know how to use an electric tool.

6.Q: Does this kind of house can only be used in residential building?
A: Absolutely not. It can be used in all kinds of buildings, such as hotel, commercial office, school, entertainment club, light industrial workshop, ect.

Certifications
Our Company
Contact Us

Contact Supplier

Ms. Christina Chen Manager Chat Now
Telephone
86-020-28982576
Mobile
18620106756
Fax
86-020-33969695
Address
C604 Quyuan Building, Yangcheng Garden, Zhongshan Avenue,Tianhe District Guangzhou,Guangdong

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Construction & Real Estate > Real Estate > Villas
Categories
Hi~