Torched on asphalt bitumen waterproof roofing sheet

Torched on asphalt bitumen waterproof roofing sheet

USD $1.85 - $3.75 /Square Meter

Min.Order:1000 Square Meters

Supply Ability:
20000 Square Meter / Square Meters per Month
Port:
Shanghai
Payment Terms:
T/T L/C D/P D/A Credit Card PayPal

Quick Details View All >

Place of Origin:
Hubei, China
Brand Name:
STAR
Model Number:
ESE-101

Wuhan Star Waterproofing Co., Ltd.

Business license
Business Type: Manufacturer
Wuhan Hubei China
Main Products: SBS Modified Bitumen Waterproofing Membranes ,Self Adhesive Bitumen Membranes ,PVC Waterproofing Membranes ,Polyurethane Waterproofing Coatings ,APP Modified Bitumen Waterproofing Membranes

Product Details

Torched on asphalt bitumen waterproof roofing sheet            

1.Introduction

 

SBS (Styrene -butadiene-Styrene) modified bitumen membrane is made by saturating the base in bitumen, or thermoplastic elastomer (such as SBS, APP, APAO, APO), reinforced with polyester or fiberglass, finishing the upward face with polythene membrane, fine sands or mineral slates (or grains) or etc.

 

2.Specification

 

Thickness

3mm, 4mm, 5mm

Width

1m

length

7.5m, 10m, 15m, or on demand

Base

Polyester or Fiberglass felt

Surface

PE film, Aluminum foil, Yellow sand, Shale gravel(Schist),   colored sand

Type

could self-adhesive

Notice

SBS modified bitumen membrane is specially applied in the cold district

3. Applications

 

1)        Roof and underground in industrial and civil buildings.

 

2)        Bridge, subway, tunnel, swimming pool, etc.

 

3)        Waste landfill, sewage plant, irrigation system, etc.

 

 

 

Torched on asphalt bitumen waterproof roofing sheet

 

 

 

4.Advantages

 

1)       The SBS modified bitumen is showed good performance on waterproofness;

 

2)       It will be a high-strength membrane to resist water;

 

3)       Puncture-resisting, tear-resisting, corrosion-resisting, mould-resisting and weather-resisting;

 

4)       Good tensile strength and elongation;

 

5)       Strong adaptability for substrate shrinkage, deformation and cracks;

 

6)       Both high and low temperature resistance, especially in cold areas;

 

7)       Convenient to apply: use heat fusion method in all seasons.

 

 

5.Pictures for your reference

 

 

Torched on asphalt bitumen waterproof roofing sheetTorched on asphalt bitumen waterproof roofing sheetTorched on asphalt bitumen waterproof roofing sheet

 

 

 

Our Factory Show

 

 

Torched on asphalt bitumen waterproof roofing sheetTorched on asphalt bitumen waterproof roofing sheetTorched on asphalt bitumen waterproof roofing sheetTorched on asphalt bitumen waterproof roofing sheetTorched on asphalt bitumen waterproof roofing sheetTorched on asphalt bitumen waterproof roofing sheet

 

Torched on asphalt bitumen waterproof roofing sheet

 

 

 

Certification Show

 

 

 

Torched on asphalt bitumen waterproof roofing sheetTorched on asphalt bitumen waterproof roofing sheetTorched on asphalt bitumen waterproof roofing sheet

 

 

6. Technical Index(Executive standard: GB18242-2008)

 

APP   Waterproof Membrane Reinforced   base

PY

G

Type

I

II

I

II

Content   of soluble substances(g/m2)≥

2mm

 

1300

3mm

2100

4mm

2900

Water   impermeability

Pressure   (Map)

0.3

0.2

0.3

Retention   time (min)

Impermeability   within 30 min

Heat   resistance °C

110

130

110

130

Tensile   strengthN/50mm≥

Longitudinal

450

800

350

500

Transverse

250

500

Elongation   at break %≥

Longitudinal

25%

40%

-------

-------

Transverse

Tear   strength N≥

Longitudinal

250

350

250

350

Transverse

170

200

Low   temperature flexibility°C

3

-10

3

-10

 

 

7.Storage and Transportation

 

1)        Different type and specification should be stacked separately;

 

2)        Avoid sun-scorched and rain-drenched, Be ventilation;

 

3)        The storage temperature should below 50°C;

 

4)        It have to be one storey when keep in storage stand on end, and shouldn't be more than two storeys when transporting;

 

5)        Avoid tilting or lateral drift, Covered with tarpaulin if need;

 

6)        Base on the normal storage and transportation, the storage period is one year from the date of production.

 

8.  Construction Technology

 

1)     Base processing: the base surface must be clean, solid, level, dry; no grit, rift and loosing dust. For a large recess, fill it with cement mortar and then level it. Remove the protrusion and clean dust. If working on base slab or lateral face, water lowering should be done.

 

2)     Painting primer: before laying the membrane, clean the dust on the surface of concrete base with dust catcher or dust-blower.

 

3)     Heat to melt: place membrane correctly, fire torch, heat the membrane with base entirely, when the surface of the membrane is black and bright with a fusion layer, apply the membrane and press it into a solid and flat state. Before the membrane is cool, seal the edge of joint by float.

 

4)     Requirements for lapping: There should be less than 3 layers of lapping, with the joint seams appearing as "T" type, avoid 4 layers of lapping. The width of longitudinal lapping is between 50 and 80mm, and of end-lap joint 100mm.

 

 

Torched on asphalt bitumen waterproof roofing sheet

 

Sample is free of charge.

Reasonable Price, Excellent Quality & Attentive Service

The delivery time is about 15-20 days after receiving the deposit.

We offer not just excellent products but service and market solutions.

Welcome to visit our homepage or contact with us for more information.

Contact Supplier

Mr. Star sales manager Chat Now
Telephone
86-27-84777225
Mobile
86-18672778652
Address
huangjinkou industrial area, hanyang, wuhan china Wuhan,Hubei

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Construction & Real Estate > Waterproofing Materials > Waterproof Membrane
Categories
Hi~