manufacturer: black colour PU waterproof coating
USD $1.774 - $1.855 /Ton
Min.Order:18 Tons
Shandong Huiyuan Building Materials Group Co., Ltd.
manufacturer: PU sealant waterproof coating for roof tiles, wall
manufacturer: building coating, elastic and waterproof paint
good factory: polythurethane (PU) waterproof paint and coating
manufacturer: single component polyurethane roof waterproofing coating
manufacturer: water based primer, HIGHLY PENETRATIVE BITUMEN PRIMER
manufacturer: elastic and waterproof paint and asphalt waterproofing coating
one/two component polyurethane roof waterproof coating
Main features:
1.It is safe and environment-friendly product without solvent or pollutants. And it has approved tests by state related testing bodies so it is applicable directly to dinking waterproof works.
2.As mono-component product, it is easier to handle. And coating application is simple.
3.Compose of pure polyurethane, the coating film is featured with rubber's properties. High-elasticity, high-strength, high-extensibility and high adhesion.
4.It is applicable to heavy-film coating, and the film has high compatibility without pinholes or bubbles.
5.The film is generated by chemical reaction, featured with water-resistance, corrosion resistance, fungus resistance.
6.It is featured with good physical and mechanical properties ,high resilience, anti-fatigue, aging resistance. Its tensile strength reaches as high as 3Mpa with elongation at break 600%.
7.Good weather ability makes it adaptable to drastic changes of weather regardless of hot or cold.
8.Water-curing Mechanism make the scope of its application wider.
Construction Points:
1.Base-treatment:it is required to be firm, leveled, clean, and dry.
2.partial treatment: internal and external corners should be shaped arch, the joints between pipes, walls and plates should be filled with this product. If necessary, non-woven fabric or fiberglass mesh fabric should be added to these joints. After this, coating-application of large-area can be carried out.
3.Application of coating: coat the base several times(2-3times suggested),the direction coating of different times should be perpendicular. Another time of coating should be not carried out until the previous coating is too dry to stick to hands.
4.Vertical-face Treatment of walls :after painting the last time of coating, sand should be scattered before it is solidified.
5. Construction of external layer: after the coating is solidified completely(about 48 hours), conduct the construction of external layer.
6. Suggested Quantity: Film Thickness:1MM, Coating Dosage:1.2-1.25kg/sqm.
Scope of Application:
1.Its applicable to waterproof and moisture works all kinds of building,eg roofing, basements, balconies ,kitchens, lavatories and so on.
2.It is very suitable for waterproof construction for place where the shape is complex and many pipeline bend places.
Technical data:
No | Item | National StandardⅠ | National Standard Ⅱ | ||
1 | Solid Content %≥ | 80 | |||
2
| Dry Time h≤ | Dry time of Outside | 12 | ||
Dry time of Inside | 24 | ||||
3 | Fracture tensile strengthMpa≥ | 1.9 | 2.45 | ||
4 | Breaking elongation,(normal temperature) %≥ | 550 | 450 | ||
5 | Water impermeability, 0.3Mpa 30 min | Impermeable | |||
6 | bending at low temperature°C ≤ | -40 | |||
7 | Bonding strength of Moistbase Mpa ≥ | 0.5 |
|