Automatic PE Film Shrink Wrapping Machine
1.Technical Parameter of equipment
Electrical source: AC 380V/220V 50HZ
Maximum power: 18KW
Working air pressure:0.6 MPa
Air compressor requirement: exhaust pressure: 0.8MPa, flux: 0.25m3/min
All kinds of thermal shrinkage film for example: PE,PP,PVC,POF
Width of wrapping film:≤600mm
Thickness of wrapping film: 0.03-0.15mm
Feeding conveyor height: 920mm(adjustable)
Length of feeding conveyor:2600mm
Outlook dimension of equipment: 5050*3300*2100 mm
Total Weight of equipment: 1200kg
2.Technical parameter of packing products:
Maximum packing dimension:600*400*350 mm( big diameter bottle could be 450*300*400mm)
The length of thermal sealing & cutting knife: 700mm
Thermal shrinkage temperature: 160-250 °C
Speed: 8-12 packages
Technical requirement and request:
- Packing terms:
(1)350/500/550/600ML large package: 4*6, 4*5
Small package: 3*4, 3*5
Four packing terms.
(2)1L/1.5L/2L/2.5L large package:3*3,3*4
Small Package:2*2,2*3
Four packing terms.
- For the pop can packing ,we advise packing with pallet,it will be steady.
- Packing speed:8-12 bundles/minute
- Satisfy the speed of the liquid filling machine.
(1)350/500/550/600ML large package :4*6, 4*5, (12000-15000 bottles/hour
in one package(round shape or rectangle)
4 rows 4*6 4*5 4*4 applicable bottle dimension: Φ40-Φ73mm
3 rows 3*4 3*3 3*5 applicable bottle dimension: Φ73-Φ98mm
2 rows 2*3 2*4 applicable bottle dimension: Φ98-Φ140mm
1 row 1*2 applicable bottle dimension: Φ140-Φ300mm
The photo view of our production
Company Information:
Jiangsu Kingwan Machinery Co., Ltd. was established in 2000s, with more than15 years' experience on machinery production. We began our filling machinery manufacture in 2000s. As the most qualified manufactrer, we dedicate ourselves to provide you the best machine with best price.
We can provide production line as below:
1. Drinking mineral water complete production line.
2. Fruit juice/milk complete production line.
3. Carbonated beverage complete production line.
4. 3 Gallons and 5 Gallons bottle water complete production line.
5. Wine/alcohol filling, labeling, packaging production line.
3-in-1 bottle water filling machine line
Partial suppliers:
Package and Shipping:
Location:
1.Why do you choose our factory ?
Our company was established in 1998. We have enough experience and fund to provide you the high-quality products with the best price .
2.How long can you delivery ?
About 30 days after we received the deposit(30%T/T in advance ,70% T/T before shipment )
3.How about your after-sale service ?
One year repair for free
Seller responsible for arrange engineer for installation and guide the workers of buyer how to operate and necessary repair .and give buyer a turnkey project.
4.How long can you finished the installation .
About 10-15 days , If the water and electricity is ready .
If you have any questions , please do not hesitate to contact me.
Web:
Tel/WhatsApp:0086 15370396538
skype: Kingwan8861
TradeManager : cn1515591119oeko