Automatic shrink wrapping machine
USD $20,000 - $40,000 /Set
Min.Order:1 Set
Jiangsu King Wan Machinery Co., Ltd.
High speed automatic sleeve labeling machine
Labeling Machine Features:
1. Machine main construction by Stainless Steel #304.
2. PLC combined with touch screen control system.
3. High accuracy labeling, ±1mm tolerance.
4. Servo motor driven labeling head, labeling speed is automatically synchronized with conveyor speed to ensure high speed and quality labeling.
5. Equipped with bottle separating wheel to keep distance between two bottles.
6. With CE Certificate
Specification
Model | ALB-510/ALB-515 |
Label Height/ Width | A: 10-110mm; C: 10-170mm |
Label Length | 10-300mm |
Product Dia./Width | 25-100mm |
Labeling Speed | 12-35m/min |
Reel Inner/ Outer Dia. | 76mm/ Within 360mm |
Machine Dimension (mm) | L2010×W1110×H1550 |
The photo view of our production
Control Cabinet
Mitsubishi PLC
Mitsubishi Frequency Transformer
Company Information:
Jiangsu Kingwan Machinery Co., Ltd. was established in 2000s, with more than15 years' experience on machinery production. We began our filling machinery manufacture in 2000s. As the most qualified manufactrer, we dedicate ourselves to provide you the best machine with best price.
We can provide production line as below:
1. Drinking mineral water complete production line.
2. Fruit juice/milk complete production line.
3. Carbonated beverage complete production line.
4. 3 Gallons and 5 Gallons bottle water complete production line.
5. Wine/alcohol filling, labeling, packaging production line.
3-in-1 bottle water filling machine line
Partial suppliers:
Package and Shipping:
Location:
1.Why do you choose our factory ?
Our company was established in 1998. We have enough experience and fund to provide you the high-quality products with the best price .
2.How long can you delivery ?
About 30 days after we received the deposit(30%T/T in advance ,70% T/T before shipment )
3.How about your after-sale service ?
One year repair for free
Seller responsible for arrange engineer for installation and guide the workers of buyer how to operate and necessary repair .and give buyer a turnkey project.
4.How long can you finished the installation .
About 10-15 days , If the water and electricity is ready .
If you have any questions , please do not hesitate to contact me.
Web:
skype: Kingwan8861
TradeManager : cn1515591119oeko